• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, June 17, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica targeting 346 million barrels of gross unrisked oil at Kavango West-1X, raises C$19m for exploration

    Koryx Copper raises $14.9m ahead of updating Haib project’s PEA in 2025

    Koryx Copper now employs more than 50 permanent workers, including 12 geologists and four engineers at Haib project

    Rhino Resources targets new well – Volans-1X late July or early August

    Rhino Resources targets new well – Volans-1X late July or early August

    Andrada Mining secures Goantagab orebody, has option to acquire Goantagab Mining for US$15m

    Andrada Mining secures Goantagab orebody, has option to acquire Goantagab Mining for US$15m

    South32 agrees to extend strategic alliance agreement with Noronex to Botswana

    South32 agrees to extend strategic alliance agreement with Noronex to Botswana

    Celsius Resources progresses Opuwo Cobalt Project disposal plans

    Celsius Resources progresses Opuwo Cobalt Project disposal plans

    New mineralisation at Elevate Uranium’s Marenica project, displaying an interval of 13m at 203 eU3O8 ppm

    New mineralisation at Elevate Uranium’s Marenica project, displaying an interval of 13m at 203 eU3O8 ppm

    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Rössing Uranium spends N$4.37b buying locally in 2024

    Rössing Uranium spends N$4.37b buying locally in 2024

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Andrada Mining secures Goantagab orebody, has option to acquire Goantagab Mining for US$15m

by Editor
June 17, 2025
in News
0
Andrada Mining secures Goantagab orebody, has option to acquire Goantagab Mining for US$15m
499
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining has secured additional supply from a tin ore body at Goantagab in the Kunene region owned by Goantagab Mining.
The company has the option to acquire 100% of Goantagab Mining shares for US$15 million, subject to certain conditions.
Birca and Boltbroker Investments Proprietary jointly own Goantagab Mining, which serves as the operating agent on behalf of the owners of 18 mining claims located in the Goantagab area of Namibia’s Kunene Region near Khorixas.
The 18 claims, situated within Goantagab, are the source of high-grade tin ore intended to supply the Agreement.
According to Goantagab Mining’s internal, unaudited management accounts as of 12 June 2025, the company has no turnover, profits, or asset value.

High-margin feedstock

By acquiring the Goantagab ore body, Andrada Mining secures a potential source of high-margin feedstock that could significantly enhance throughput at Uis.
To unlock this value, Andrada has finalised an Ore Supply and Profit Share Agreement between its wholly owned subsidiary, Uis Tin Mining Company Proprietary Limited, and Goantagab Mining Proprietary Limited, which acts as an agent for the relevant mining claim owners. Simultaneously, Uis Tin Mining Company Proprietary Limited has entered into a Management Agreement with Birca Mining Namibia Proprietary Limited as an independent contractor to operate the recently announced additional jig plant at Uis.
Once commissioned, the 100-tonne-per-hour jig plant will ensure that processing the high-grade ore from Goantagab complements production from the existing operations at Uis.
The accelerated commissioning of the plant, combined with high-grade feedstock from Goantagab, will enable rapid production ramp-up.
Uis Tin Mining Company Proprietary Limited has also entered into an Ore Supply and Profit-Sharing Agreement with Goantagab Mining for the supply of up to 240 000 tonnes per year of high-grade ore averaging 1.5% tin.

Historical drilling

During the 1980s, Gold Fields Namibia, a subsidiary of Gold Fields South Africa Limited, conducted extensive exploration and feasibility activities in the region.
Following Namibia’s independence, the area was held under a mining license until its expiry in 2019.
Gold Fields Namibia confirmed, at the time, a non-JORC-compliant resource of tin grades greater than 1%.
Gold Fields Namibia also delineated an initial non-JORC-compliant resource at Goantagab, exceeding two million tonnes with an average grade of 0.95% tin.
The company identified higher tin-grade zones of up to 1.75%, with approximately 20,000 metres drilled to date.
The mineralised zones, with grab samples exceeding 17% tin, were also identified but not drilled, indicating further upside potential.

Pre-feasibility study

Although Andrada Mining has completed its pre-feasibility study, it has not verified this resource and cannot be relied upon; it is provided for guidance purposes only regarding the potential in the area.
Andrada Mining says there is an intention among all partners involved in this transaction to complete additional work and prepare a JORC-compliant resource for this area in due course; however, this will not delay the the delivery of ore to Uis under the Agreement.
According to Andrada Mining, the acquisition is expected to have no impact on the short-term supply of ore from the mining claims, and further updates will be provided as necessary.

Global tin potential

Andrada Mining CEO Anthony Viljoen says the collaboration with Birca on the Goantagab deposit reaffirms the company’s strategy in creating a mining district for critical minerals in the Erongo.
Viljoen also says that based on historical resource data and Andrada Mining’s independent assessment, the deposit has the potential to be compared to other high-grade occurrences of tin globally.
He says once production at the plant is fully commissioned, it will significantly increase the tin concentrate throughput, thereby elevating the company’s position in the global market.
“At Uis, construction of the new jig plant is well underway, and we remain on track to commence production in the second half of 2025.
“This ore acquisition agreement reflects the continued evolution of Andrada’s asset portfolio and our ability to forge timely and opportunistic strategic partnerships that accelerate development and enable large-scale execution,” Viljoen says.

 

Share200Tweet125
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

ReconAfrica targeting 346 million barrels of gross unrisked oil at Kavango West-1X, raises C$19m for exploration

June 17, 2025
Koryx Copper raises $14.9m ahead of updating Haib project’s PEA in 2025

Koryx Copper now employs more than 50 permanent workers, including 12 geologists and four engineers at Haib project

June 17, 2025
Rhino Resources targets new well – Volans-1X late July or early August

Rhino Resources targets new well – Volans-1X late July or early August

June 17, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe