• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, May 8, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

    Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

    Consolidated Copper’s restart of Central Operations based on 10-year mine plan

    Consolidated Copper’s restart of Central Operations based on 10-year mine plan

    Connected Minerals Limited to explore three zones at its Etango North-East uranium project

    Connected Minerals Limited to explore three zones at its Etango North-East uranium project

    Ongombo copper-gold project’s ESIA at an advanced stage

    Ongombo copper-gold project’s ESIA at an advanced stage

    Elevate Uranium expands mineralisation at Namib IV at the Koppies Project

    Elevate Uranium expands mineralisation at Namib IV at the Koppies Project

    Askari Metals keeps reduced team at Uis project for low-cost but high impact

    Askari Metals keeps reduced team at Uis project for low-cost but high impact

    Xinfeng wins battle over Orange River Mining ownership

    Xinfeng wins battle over Orange River Mining ownership

    Arcadia Minerals engaging potential development partners for four of its five projects

    Arcadia Minerals engaging potential development partners for four of its five projects

    Canadian company buys two greenfield uranium EPLs in Erongo region for N$14,9m

    Canadian company buys two greenfield uranium EPLs in Erongo region for N$14,9m

    Pancontinental seeks in-country specialist for its environmental impact assessment ahead of drilling PEL 87

    Pancontinental seeks in-country specialist for its environmental impact assessment ahead of drilling PEL 87

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Ongombo copper-gold project’s ESIA at an advanced stage

by Editor
May 7, 2025
in News
0
Ongombo copper-gold project’s ESIA at an advanced stage
508
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

The Ongombo copper-gold project’s environmental and social impact assessment is at an advanced completion stage, with the ore processing testwork now permitted.
The Ongombo project is on EPL 5772 in the Khomas region, 45 km from Windhoek.
The project area has relatively well-developed infrastructure on the Ongombo Ost and Ongombo West farms.
African Pioneer has an 85% shareholding in the project, whose indicated mineral resource estimate is 5.7Mt at 1.1% Cu equivalent, 0.94% Cu and 0.23g/t Au and inferred underground potential resources of 23Mt at 1.1% CuEq, 0.95% Cu and 0.24g/t Au.
The mineral resource estimate announced on May 16, 2023, resulted in an additional 100,000 tons of contained copper metal and a further 84,000 oz of gold across all resource categories.
The resource estimate was based on 295 drill holes completed between 1988 and 1991 by Addison, with a further 33 holes drilled between 2008 and 2014, followed by 54 holes drilled by African Pioneer.
The Ongombo mineralisation remains open at depth with the scope for adding further tonnage, and based on recent twinned drilling, there is potential for significantly enhanced gold grades in the East.
At the Ongombo project, mineralisation occurs in one continuous zone approximately 7 km long and 0.5 – 1 km wide.
The mineralisation zone dips consistently 15-20° northwest and plunges 5° northeast. Mineralisation is gradually thinning westward.
Mine design criteria assume a discount rate of 10% for the base case, and metal prices include copper at US$9,100 per tonne, gold at US$2,300 per ounce, and silver at US$28 per ounce.
Payability factors of 82%, 70% and 70%, respectively, were applied to all copper, gold and silver assumed to be recovered.
The Ongombo Mining Licence granted in September 2022 is subject to the completion of the environmental and social impact assessment.
On June 10 2024, a new application for an environmental clearance certificate was lodged, and post the period end on April 2 2025, the company announced the approval of the environmental clearance certificate and that this sets in motion the final standard statutory procedures required to activate the previously granted mining licence 240.
The renewal of EPL 5772 until February 1, 2026, is reflected on the Namibian Mines and Energy Cadastre Map Portal.
A conditional environmental clearance certificate for mining activities was granted on EPL 5772 and is valid until April 16, 2026.
A 20-year mining licence 240 was granted on August 10 2022, and covers a portion of EPL 5772 and approximately one-third of the open pit resource.
An extension to the mining licence was submitted on September 6, 2022, to encompass the wider resource area.

Share203Tweet127
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

May 8, 2025
Consolidated Copper’s restart of Central Operations based on 10-year mine plan

Consolidated Copper’s restart of Central Operations based on 10-year mine plan

May 8, 2025
All eyes on Antelope deposit as Otjikoto open pit mining operations end in 3Q 2025

All eyes on Antelope deposit as Otjikoto open pit mining operations end in 3Q 2025

May 8, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe