• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, November 27, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    50 cyclists to race through Otjihase copper mine’s underground tunnels

    50 cyclists to race through Otjihase copper mine’s underground tunnels

    BW Energy begins monthly PEL 73 funding after exhausting C$22m investment

    ReconAfrica in talks to terminate NAMCOR stake acquisition

    ReconAfrica in talks to terminate NAMCOR stake acquisition

    Celsius Resources progresses Opuwo Cobalt Project disposal plans

    Bank of Namibia grants conditional approval for US$15m Opuwo cobalt project sale

    Kaoko Metals strikes copper-silver mineralisation at two prospects 2.2km apart

    Kaoko Metals strikes copper-silver mineralisation at two prospects 2.2km apart

    Giyani secures US$2.5m for K.Hill manganese project in Botswana

    Giyani secures US$2.5m for K.Hill manganese project in Botswana

    Namibia mining output falls 17% as Chamber warns of further contraction

    Namibia mining output falls 17% as Chamber warns of further contraction

    Huaye recruits 40 workers for Khoemacau expansion in Botswana

    Huaye recruits 40 workers for Khoemacau expansion in Botswana

    Skeleton Coast Uranium raises C$3.56m for Namibia exploration

    Skeleton Coast Uranium raises C$3.56m for Namibia exploration

    Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

    Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Pioneer Lithium to start drilling at Warmbad Uranium Project in second half of 2025

by Editor
April 10, 2025
in Uranium
0
Pioneer Lithium to start drilling at Warmbad Uranium Project in second half of 2025
535
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Pioneer Lithium has scheduled a targeted drilling program at the Warmbad Uranium Project under EPL 8838 in Namibia’s southern uranium corridor for the second half of 2025.
The plan to drill comes after Pioneer Lithium secured and reviewed significant historical exploration data for the Warmbad Uranium Project.
The dataset, sourced directly from the mines ministry, confirms the presence of extensive, thick zones of uranium mineralisation consistent with the alaskite-hosted system seen at Namibia’s Rossing Mine.
The previous explorer, Xemplar Energy Corp, undertook a comprehensive drilling program across the Warmbad tenement, completing 161 reverse circulation (RC) holes and 11 diamond drill holes for 31,685 metres between 2007 and 2009.
These efforts defined three priority mineralised zones, Areas 1, 3 and 5, each demonstrating a strong continuity of uranium mineralisation within alaskitic granites and a clear potential for expansion.
Drilling at Area 5 returned multiple thick intercepts of uranium mineralisation, with individual holes recording cumulative uranium contents of up to 1% cumulative grade thickness U₃O₈ and several holes intersecting mineralisation over downhole intervals exceeding 50 metres.
According to the dataset, intercepts and cumulative grade thicknesses include 72 metres at 140.1 parts per million triuranium octoxide for 1% U3O8 GT, 77 metres at 127.4 ppm U3O8 for 1% U3O8GT, 79 metres at 126.9 ppm U3O8 for 1% U3O8 GT; and 49 metres at 154.7 ppm U3O8 for 0.76% U3O8 GT.
While the quality of the historic drilling is generally robust, specific technical aspects, including the absence of downhole deviation surveys and the lack of core orientation in diamond drilling, mean the dataset does not meet the standards required for a JORC 2012-compliant mineral resource estimate.
Pioneer Lithium’s drilling program will include reverse circulation drilling to validate historical results and assess structural continuity.
The diamond drilling will be designed to collect structural data and test for depth extensions.
With drilling scheduled to begin in the second half of 2025, Pioneer Lithium’s objectives are to validate and extend historical results, enhance geological understanding, and advance the project toward a maiden mineral resource estimate.
Pioneer Lithium CEO Michael Beven says Warmbad gives an immediate presence in a globally respected uranium jurisdiction with scale, geology, and infrastructure.
“This project comes with over 30,000 metres of drilling already completed, with consistent mineralisation across multiple zones and strong indications of system size.
“It’s rare to gain access to a project of this calibre at such an advanced stage. With nuclear energy reasserting itself as a cornerstone of global energy policy, we are confident that Warmbad will become a flagship asset for Pioneer and a key contributor to our growth strategy,” Beven says.
Pioneer Lithium acquired the Warmbad Project, which spans 271 square kilometres, from Rondon Metals in January 2025.

Share214Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
Namibia’s next multi-mineral growth province

Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

May 25, 2026
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
50 cyclists to race through Otjihase copper mine’s underground tunnels

50 cyclists to race through Otjihase copper mine’s underground tunnels

November 26, 2026

BW Energy begins monthly PEL 73 funding after exhausting C$22m investment

November 26, 2026
ReconAfrica in talks to terminate NAMCOR stake acquisition

ReconAfrica in talks to terminate NAMCOR stake acquisition

November 26, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe