• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, September 23, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Ongombo copper mine owner secures £1m convertible loan

    Xinhai Ongombo deal meets all conditions

    Sultan Resources enters Namibia staking claim in the Damara Gold Belt

    Sultan raises A$1.3m to start Namibia copper-gold exploration

    Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

    Stamper cuts Namibia oil asset cash bill by US$750,000

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx hits 438m at 0.40% CuEq as Haib PFS nears

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    SciAps takes real-time mineral analysis deeper into African exploration

    SciAps takes real-time mineral analysis deeper into African exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    RCC board investigates procurement behind N$30m fuel deals

    RCC board investigates procurement behind N$30m fuel deals

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

BW Energy secures US$500m new increased Reserve Lending facility

by Editor
April 7, 2025
in News
0
575
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

BW Energy has announced an up to US$500 million Reserve Based Lending (RBL) facility to finance development activities and drive future production growth.
The company has a 95% interest in the Kudu field. It also holds approximately 6.6% of the ordinary shares in Reconnaissance Energy Africa Ltd. and a 20% non-operating interest in the onshore Petroleum Exploration License 73.
In Namibia, BW Energy has sanctioned the drilling of an appraisal well targeting the Kharas Prospect northwest in the Kudu licence with planned start-up drilling operations in the third quarter.
Long-lead items have been secured, and the Company is reviewing offers for rig capacity.
The development planning and concept selection for the Kudu gas-to-power project also continued with relevant stakeholders.
The company says the new facility replaces the US$200 million RBL from 2022, which was increased to US$300 million in 2023.
The funds will be used together with cash flow from operations to finance the company’s further development.
The facility has an initial commitment of US$400 million, which can be expanded with an additional US$100 million.
The senior secured long-term debt facility matures on 1 October 2030.
BW Energy’s chief finance officer, Brice Morlot, says the increased facility provides further liquidity to finance BW Energy’s development activities and drive its future production growth and long-term value creation, at a competitive interest margin.
Mauritius Commercial Bank Limited is the Facility Agent for the RBL facility, while SCB and Rand Merchant Bank are Joint Technical banks.
The syndicate further includes NedBank Group and ABSA Group (documentation bank), alongside SHELL, the offtaker of oil from the Dussafu license.

Share230Tweet144
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Ongombo copper mine owner secures £1m convertible loan

Xinhai Ongombo deal meets all conditions

September 23, 2026
Sultan Resources enters Namibia staking claim in the Damara Gold Belt

Sultan raises A$1.3m to start Namibia copper-gold exploration

September 23, 2026
Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

Stamper cuts Namibia oil asset cash bill by US$750,000

September 22, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In