• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, June 7, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Rössing Uranium spends N$4.37b buying locally in 2024

    Rössing Uranium spends N$4.37b buying locally in 2024

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica seeks to raise N$130m for Kavango West-1X well exploration

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Consolidated Copper appoints Stegmann interim chief operating officer

    Consolidated Copper appoints Stegmann interim chief operating officer

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Northern Graphite plans restarting Okanjande in 2027

    Northern Graphite plans restarting Okanjande in 2027

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    B2Gold Namibia spends US$107m on local procurement in 2024

    B2Gold Namibia spends US$107m on local procurement in 2024

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Andrada Mining processes 244,314 tons of tin ore from Uis Mine in the past 12 months

by Editor
March 31, 2025
in News
0
Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit
527
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining’s annual tin ore processed for the third quarter ended February 2025 increased by 5.4% year-on-year to 965 058 tons and by 2.6% to 244 314 tons for the quarter, driven primarily by a higher throughput rate. The plant processing rate for the quarter was 141 tph, up from 130tph in Q3 FY2025 and 137tph in Q4 FY2024.
The increased throughput contributed to the 2.2% year-on-year increase in tin concentrate to 379 tons for the quarter.
The lower recovery rate in Q4 FY2025 was due to the necessary plant optimisation following the CI2 programme.
Consequently, the contained tin tonnage was 1.3% lower at 228 tons compared to the same quarter in FY2024. However, the higher recovery rate at 72% annually resulted in a 5.3% year-on-year increase in contained tonnage to 932 tons (FY2024: 884 tonnes).
The year-on-year tantalum concentrate annual and quarterly production doubled to approximately 51 and 10 tons, respectively.
Similarly, contained tantalum production increased to 5.4 tonnes in FY2025 and 1.1 tons in Q4 FY2025, driven primarily by the production ramp-up into Q1 FY2025.
The concentrate tonnage decreased in Q4 FY2025 compared to Q3 FY2025 due mainly to temporary plant outages, which were successfully resolved within the Quarter.
Annually, the recovery rate improved significantly to 4.5% (FY2024: 0.6%), benefiting from the reprocessing of previously produced concentrate.
The company produced about 46 tons and 128 tons of petalite from Uis ore for potential off takers in the quarter and FY2025, respectively.
Engagement with offtakers continued unabated in the quarter, as highlighted by a bulk sample shipped to Japan.
Andrada Mining received a US$1.5 million balance of the SQM participation fee in March 2025 after the Namibia Competition Commission approved the three-stage earn-in agreement to develop Lithium Ridge for SQM Australia (Pty) Ltd.
The CEO, Anthony Viljoen, says Andrada Mining delivered on significant objectives this quarter, including securing approval for the SQM earn-in agreement.
Viljoen says Andrada Mining continues demonstrating steady and sustainable growth across our tin operations, achieving higher tin concentrate tonnage and increased shipments this quarter.
“Our ongoing Continuous Improvement programme continues to yield positive results, with processing rates reaching 141, the highest level of the past five quarters,” Viljoen says.

Share211Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

June 6, 2025
Rössing Uranium spends N$4.37b buying locally in 2024

Rössing Uranium spends N$4.37b buying locally in 2024

June 5, 2025
Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

June 5, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe