• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, September 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Mining Diamonds

Namibia’s production of rough diamonds decreased by 3% to 1.2 million carats in the quarter ending June 30, 2024.

by Editor
July 25, 2024
in Diamonds
0
De Beers rough sales improve but full recovery uncertain
540
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Namibia’s production of rough diamonds decreased by 3% to 1.2 million carats in the quarter ending June 30, 2024.
De Beers says planned lower production at Debmarine was partially offset by planned mining areas with higher grades and recoveries at Namdeb.
South Africa’s production decreased by 8% to 1.1 million carats from 1.2 million carats in the same period last year due to the planned processing of lower-grade stockpiles at Venetia whilst underground operations ramp up over the next few years.
Production in Canada was broadly flat at 1.3 million carats, compared to 1.4 million carats in the quarter ending June 30, 2023.
In Botswana, production was reduced by 24% to 9.7 million carats, down from 12.7 million in the same quarter last year.
The decline was driven by intentional lower production and short-term changes in plant feed at Jwaneng and Orapa.
De Beers’ overall rough diamond production declined to 13.3 million carats from 16.5 million in June 2023.
Total revenue decreased to US$2.2 billion from US$2.8 billion, with rough diamond sales decreasing to US$2 billion from US$2.5 billion.
Total rough diamond sales volumes were down 22% from 15.3 million to 11.9 million carats.
The average realised price is broadly flat at $164/ct (30 June 2023: $163/ct), reflecting a more significant proportion of higher-value rough diamonds sold, offset by a 20% decrease in the average rough price index.
Capital expenditure decreased by 13% from US$302 million to US$264 million, reflecting the phasing of life extension spending for the Venetia underground project.
Investment in the ramp-up of the Venetia underground project continues, as well as the execution of other life-extension projects, including Jwaneng Cut-9.
De Beers Group CEO Al Cook said rough diamond trading conditions continue to be challenging.
Cook added that although demand in the US has been steady and India remains robust, consumers in China are buying substantially fewer luxury products.
He said retailers are very cautious as they restock, creating higher-than-normal levels of midstream inventory.
“Despite these conditions, De Beers made significant progress in delivering our Origins strategy during the year’s first half. We have streamlined the business, materially reducing our costs and ensuring we are best placed to grow value from mining to stores as conditions improve.
“We’re revitalising demand for natural diamonds for a new generation of consumers through our collaborations with Signet, Chow Tai Fook and other leading jewellery retailers.
“We continue to support consumer confidence in natural diamonds, with high demand for our new DiamondProof lab-grown diamond detection instrument.
“While we expect the challenging rough diamond trading conditions to continue in the near-term, the actions we are taking will support the recovery in natural diamond demand and position De Beers well for the future,” Cook said.

Share216Tweet135
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Karibib Lithium Project site works to start in May, mining expected early 2025

Karibib lithium project’s long run of bad luck

September 19, 2026
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
Sultan Resources allocates N$13.3m to kickstart Namibia’s Damara Gold Project

Sultan applies for an additional 171 km² copper-gold ground in Kalkfeld

September 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In