• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, April 30, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow says Tumas engineering now more than 60% complete

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Forsys Metals starts a 29-borehole drilling program at Valencia Uranium Project

by Editor
March 26, 2024
in News
0
Forsys Metals starts a 29-borehole drilling program at Valencia Uranium Project
546
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Forsys Metals Corp has started the 2024 drilling program at its Valencia Uranium Project in Namibia.
The Valencia Uranium Project under mining licence 149 is part of Forsys Metals, Norasa Uranium Project.
Forsys Metals owns the Norasa project, which has a 25-year mining licence, and has a 100% interest in the Namibplaas project under EPL 3638.
Valencia project, on the farm Valencia 122, about 75km northeast of the town of Swakopmund, covers 735.6 ha.
The company says it has started the drilling program by investigating three zones of potential mineralisation outside the existing resource block model.
The drilling program focuses on three target areas: the Jolie Zone (~ 1km north of Valencia pit), Valencia West Extension and Valencia South.
Forsys Metals has scheduled to drill 29 boreholes targeting 5.236m to assess mineralisation to depths of up to 380m below the collar.
The company said on Tuesday that the three areas of mineralisation potential were delineated from historical exploration work, which included aerial photo interpretation, geological mapping, aeromagnetic surveys, airborne and ground scintillometer surveys, and exploration drilling.
“Investigation by drilling is required to define the mine’s surface infrastructure development and explore resource upside potential in these areas,” Forsys Metals said.
Forsys Metals provided the 2023 assay results from Valencia 2023, where it drilled 2.684.44 metres using 15 boreholes.
The drill program sought to test and assess pit slope stability and optimise pit design.
It also sought to test the continuity of mineralisation for resource modelling and confirm mineral resource estimation (MRE) parameters.
Forsys Metals sent 819 samples from 10 boreholes for testing to establish quality control protocol and procedures.
The company says the chemical results show the intersecting of multiple zones of massive alaskite intrusions and confirm uranium mineralisation in all six confirmed boreholes.
“Best mineralised borehole PQ-5 intersected 77.34 m of continuous mineralisation, averaging 439 ppm U3O8, including 41.9 m of 683 ppm U3O8,” Forsys Metals says.

 

 

Share218Tweet137
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

April 29, 2026
Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

April 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In