• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, November 18, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

    Khama warns Botswana could wait years for De Beers dividends

    Khama warns Botswana could wait years for De Beers dividends

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow blames weak share price for Tumas uranium delay

    South32 backs 4,600m copper drilling campaign in Namibia and Botswana

    South32 backs 4,600m copper drilling campaign in Namibia and Botswana

    NexMetals confirms 41.95 million tonnes of inferred resources at Selebi Mines in Botswana

    NexMetals confirms 41.95 million tonnes of inferred resources at Selebi Mines in Botswana

    Kavango looks southwest of Khoemacau for hidden copper deposits in Botswana

    Kavango looks southwest of Khoemacau for hidden copper deposits in Botswana

    Impact Oil & Gas pays Africa Oil US$31.6 million dividend from TotalEnergies Orange Basin farm-down deal

    Impact separates South African assets to concentrate on Namibia’s Venus oil project

    bp offers to cover US$63m in Eco Atlantic’s Namibia drilling costs

    bp offers to cover US$63m in Eco Atlantic’s Namibia drilling costs

    Karowe’s Botswana diamond sales reach US$61m as open-pit mining winds down

    Karowe’s Botswana diamond sales reach US$61m as open-pit mining winds down

    NDP6 – Five mines to power a nuclear future by 2030

    Bannerman reserves 40% of Etango uranium for buyers outside Chinese partnership

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

African Pioneer lines up 720,000tpa Ongombo copper plant

by Editor
October 2, 2026
in Copper
0
African Pioneer lines up 720,000tpa Ongombo copper plant
520
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

African Pioneer Plc is preparing to develop a 720,000-tonne-a-year processing operation at its Ongombo copper-gold project near Windhoek under a financing agreement that could eventually give Chinese partner Xinhai a 73.68% interest in the company holding its Namibian projects.

The company said in its interim results released on Tuesday that preparations are underway for 7,000 metres of drilling across Ongombo and the nearby Ongeama project, marking the first stage of a development programme backed by Hong Kong Xinhai Mining Services Limited.

African Pioneer currently owns 85% of the Namibian projects.

The Xinhai agreement sets out four development milestones, beginning with financing sufficient to complete the initial drilling programme. Xinhai would then undertake detailed engineering design for Ongombo before delivering construction equipment to Walvis Bay.

The final milestone provides for Ongombo to reach commercial operations through a processing plant designed to handle at least 720,000 tonnes of ore a year, together with the first phase of an underground decline to access the orebody.

Commercial operation would be considered achieved once the plant operates above 75% of its design capacity for 30 consecutive days.

African Pioneer executive chairman Colin Bird said work is now moving towards implementation.

“Operations are now being established and planning for the substantial drilling programme at Ongombo and Ongeama is well advanced,” Bird said.

“The drilling is designed to provide additional geological and technical information required for mine planning, while also seeking to expand and further define the existing mineral inventory.”

The initial 7,000 metres will be divided between Ongombo and Ongeama, while another 3,000 metres could be drilled at Ongeama depending on the results of the first programme.

The financing structure could eventually result in Xinhai taking a controlling interest in the holding company that holds the Namibian projects.

Xinhai will finance agreed development milestones through loans carrying interest of 10% per annum, while African Pioneer will provide security over its shareholding in the project holding company until the financing is repaid.

Instead of repaying in cash, Xinhai may elect to convert its financing into a 53.68% interest in the holding company after the third milestone.

That interest could rise to 73.68% once the fourth milestone is achieved.

The third milestone includes delivering construction equipment to Walvis Bay and transferring ownership of the equipment to the project holding company. It also provides for another 3,000 metres of drilling at Ongeama if results justify further work.

All conditions precedent to the definitive Xinhai agreement were satisfied in September.

African Pioneer also received a £712,786 share subscription from Xinhai on 28 September under the agreement.

Ongombo is located about 40 kilometres northeast of Windhoek in the Khomas Region and is covered by Mining Licence 240, which remains valid until March 2045.

The company says the Namibian government has granted all required approvals for the mining project.

Ongombo has a gross indicated mineral resource of 5.7 million tonnes grading 1.1% copper equivalent, comprising 0.94% copper and 0.23 grams per tonne gold.

African Pioneer also reports what it describes as 23 million tonnes of inferred underground potential resources grading 1.1% copper equivalent, 0.95% copper and 0.24 grams per tonne gold.

The project lies within the Matchless Belt and about 15 kilometres northeast of the Otjihase mine. African Pioneer says the mineralised zone at Ongombo extends for approximately seven kilometres.

Bird said the company sees Ongombo and Ongeama as the foundation for building a copper business in Namibia.

“We believe that Ongombo, together with the exploration potential at Ongeama, provides African Pioneer with an excellent opportunity to establish a meaningful copper business in Namibia,” he said.

African Pioneer is also evaluating additional opportunities in Namibia’s Northern Matchless Belt that could complement the two projects.

The company said its immediate focus for the remainder of the year is to start and execute the Namibian drilling and development programme.

Share208Tweet130
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
Namibia’s next multi-mineral growth province

Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

May 25, 2026
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

Verity gets approval for 100-t copper-silver sampling at Airstrip and Dibete in Botswana

November 18, 2026
Namibia showcases US$212m industrial projects at COP31

Namibia showcases US$212m industrial projects at COP31

November 18, 2026
Khama warns Botswana could wait years for De Beers dividends

Khama warns Botswana could wait years for De Beers dividends

November 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe