• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, July 21, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Master Power Technologies unveils R50m state-of-the-art customer experience centre at New Midrand premises

    Master Power Technologies unveils R50m state-of-the-art customer experience centre at New Midrand premises

    Castrol changes ownership as bp streamlines business

    Castrol changes ownership as bp streamlines business

    Meren Energy says TotalEnergies has submitted Venus field development plan

    TotalEnergies secures approval for offshore licence swap

    Bannerman’s 16-year path to Namibia’s 4th uranium mine

    Approval for Chinese investment in Etango tied to jobs, local businesses

    Namibia Construction and Nexus Building win A$34 million Tumas contracts

    Namibia Construction and Nexus Building win A$34 million Tumas contracts

    Nandi-Ndaitwah proposes Angola-Namibia-South Africa power corridor

    Nandi-Ndaitwah proposes Angola-Namibia-South Africa power corridor

    Arkle brings forward second uranium target after encouraging Namibia drilling

    Arkle brings forward second uranium target after encouraging Namibia drilling

    ReconAfrica penetrates 400m hydrocarbon interval at Kavango West 1X

    ReconAfrica records first onshore hydrocarbon flow during Namibia production test

    Pancontinental sees over 20 billion barrels recoverable at PEL 87

    Pancontinental launches feasibility study to improve PEL 87 seismic data processing

    Noronex launches 7,000m drilling campaign at Powerline Copper Project on Kalahari Copper Belt

    South32 backs expanded copper hunt across Noronex’s Namibian projects

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

Wia appoints John Musset as Kokoseb project director

by Editor
July 20, 2026
in Gold
0
Wia appoints John Musset as Kokoseb project director
501
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Wia Gold has strengthened its leadership team by appointing internationally experienced mining executive John Mussett as Project Director, with responsibility for advancing the company’s flagship Kokoseb Gold Project in Namibia from exploration to mine development.

The appointment, announced after the close of the company’s June quarter, comes as Kokoseb moves into a more advanced phase following the delivery of a maiden mineral resource estimate of 2.93 million ounces of gold and the start of technical studies to support a definitive feasibility study.

Mussett brings more than three decades of experience in delivering large-scale mining developments across Africa and South America.

Most recently, he served as Project Director and Senior Vice President of Projects at Toronto Stock Exchange and New York Stock Exchange-listed Aris Mining Corporation, where he managed a portfolio of mining projects valued at approximately US$2.6 billion across Colombia and Guyana.

Before joining Aris Mining, Mussett played a central role in one of Africa’s most significant gold mine redevelopment projects.

As Project Director and Vice President Projects at AngloGold Ashanti, he led the redevelopment and expansion of the Obuasi Gold Mine in Ghana, a project valued at approximately US$500 million.

The Obuasi redevelopment involved far more than reopening an underground mine. It included construction of underground mining infrastructure, a seven-million-tonne-per-annum processing plant, a paste-fill plant, a tailings storage facility, power and water infrastructure, accommodation facilities and associated non-process infrastructure.

Mussett oversaw the project from board approval through engineering, procurement, construction and commissioning to first gold production, ultimately delivering the development safely, on schedule and within budget.

The appointment signals that Kokoseb is entering a new stage where project execution and development expertise become as important as exploration success.

While the company has spent recent years expanding the resource base through aggressive drilling, attention is now shifting towards engineering, mine design, permitting and financing as it works towards establishing Namibia’s next large-scale gold mine.

Mussett’s experience leading complex projects through every stage of the development cycle is expected to strengthen Wia’s ability to manage the transition.

His background includes coordinating multidisciplinary engineering teams, overseeing procurement and construction programmes and delivering major capital projects within approved budgets and schedules, skills that will become increasingly important as Kokoseb advances towards investment decisions.

The appointment follows a period of rapid progress at Kokoseb, where drilling has continued to extend mineralisation beyond the maiden resource and technical work is gathering pace ahead of the planned definitive feasibility study.

Share200Tweet125
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Aldoro secures A$4.3 million through convertible notes for Kameelburg project

Aldoro secures A$4.3 million through convertible notes for Kameelburg project

July 21, 2026
Namibia Critical Metals approves C$11 million to design Lofdal processing plant

Namibia Critical Metals approves C$11 million to design Lofdal processing plant

July 21, 2026
Master Power Technologies unveils R50m state-of-the-art customer experience centre at New Midrand premises

Master Power Technologies unveils R50m state-of-the-art customer experience centre at New Midrand premises

July 20, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In