• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, October 13, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Arkle brings forward second uranium target after encouraging Namibia drilling

    Arkle finds uranium along 2.9km stretch near Trekkopje

    Keras becomes Okopa after securing 51% stake in Cornerstone Mining

    Keras becomes Okopa after securing 51% stake in Cornerstone Mining

    Noronex sees Powerline drill campaign as key toward commercial-scale discovery

    Noronex exits DorWit, its first Namibian copper projects

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko’s first Chalkos drilling returns individual sample grading 6.42% copper

    Why Elizabeth Bay keeps coming back from the dead

    Why Elizabeth Bay keeps coming back from the dead

    Australian company Gibb River Diamonds acquires greenfield uranium projects in Erongo and Kunene

    Permit uncertainty pushes Gibb out of Namibia uranium exploration

    Skeleton Coast Uranium seeks C$5m for Namibia exploration

    Skeleton Coast Uranium seeks C$5m for Namibia exploration

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval confirms 37.8% copper and 573g/t silver at Kaoko Basin

    Koryx hits 969m at 0.27% copper equivalent at Haib

    Haib lifts processing capacity to 48Mtpa as Koryx targets November PFS

    Forsys’ Norasa in the making

    Asarian approves 4,500m Namibplaas drilling programme to upgrade 41.1Mlb uranium resource

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

Wia appoints John Musset as Kokoseb project director

by Editor
July 20, 2026
in Gold
0
Wia appoints John Musset as Kokoseb project director
525
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Wia Gold has strengthened its leadership team by appointing internationally experienced mining executive John Mussett as Project Director, with responsibility for advancing the company’s flagship Kokoseb Gold Project in Namibia from exploration to mine development.

The appointment, announced after the close of the company’s June quarter, comes as Kokoseb moves into a more advanced phase following the delivery of a maiden mineral resource estimate of 2.93 million ounces of gold and the start of technical studies to support a definitive feasibility study.

Mussett brings more than three decades of experience in delivering large-scale mining developments across Africa and South America.

Most recently, he served as Project Director and Senior Vice President of Projects at Toronto Stock Exchange and New York Stock Exchange-listed Aris Mining Corporation, where he managed a portfolio of mining projects valued at approximately US$2.6 billion across Colombia and Guyana.

Before joining Aris Mining, Mussett played a central role in one of Africa’s most significant gold mine redevelopment projects.

As Project Director and Vice President Projects at AngloGold Ashanti, he led the redevelopment and expansion of the Obuasi Gold Mine in Ghana, a project valued at approximately US$500 million.

The Obuasi redevelopment involved far more than reopening an underground mine. It included construction of underground mining infrastructure, a seven-million-tonne-per-annum processing plant, a paste-fill plant, a tailings storage facility, power and water infrastructure, accommodation facilities and associated non-process infrastructure.

Mussett oversaw the project from board approval through engineering, procurement, construction and commissioning to first gold production, ultimately delivering the development safely, on schedule and within budget.

The appointment signals that Kokoseb is entering a new stage where project execution and development expertise become as important as exploration success.

While the company has spent recent years expanding the resource base through aggressive drilling, attention is now shifting towards engineering, mine design, permitting and financing as it works towards establishing Namibia’s next large-scale gold mine.

Mussett’s experience leading complex projects through every stage of the development cycle is expected to strengthen Wia’s ability to manage the transition.

His background includes coordinating multidisciplinary engineering teams, overseeing procurement and construction programmes and delivering major capital projects within approved budgets and schedules, skills that will become increasingly important as Kokoseb advances towards investment decisions.

The appointment follows a period of rapid progress at Kokoseb, where drilling has continued to extend mineralisation beyond the maiden resource and technical work is gathering pace ahead of the planned definitive feasibility study.

Share210Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Wia Gold lifts Kokoseb resource from 2.12 million ounces to 2.93 million ounces

Wia drilling strengthens Kokoseb underground gold expansion potential

October 13, 2026
Arkle brings forward second uranium target after encouraging Namibia drilling

Arkle finds uranium along 2.9km stretch near Trekkopje

October 12, 2026
Keras becomes Okopa after securing 51% stake in Cornerstone Mining

Keras becomes Okopa after securing 51% stake in Cornerstone Mining

October 12, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In