• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, October 17, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Deep Yellow postpones Tumas investment decision beyond 2026

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas finds multiple high-grade copper zones at Deblin near Otavi

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval allocates US$7.1m to Namibia copper exploration

    Madison Metals starts drilling at Khan Project in Namibia

    Critical One plans Critical Two Energy for Namibian uranium assets after failed US$3.5m sale

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast commits N$13.75m to uranium exploration near Langer Heinrich

    Higher uranium prices cushion 19% production drop at Langer Heinrich

    Higher uranium prices cushion 19% production drop at Langer Heinrich

    Arkle brings forward second uranium target after encouraging Namibia drilling

    Arkle finds uranium along 2.9km stretch near Trekkopje

    Keras becomes Okopa after securing 51% stake in Cornerstone Mining

    Keras becomes Okopa after securing 51% stake in Cornerstone Mining

    Noronex sees Powerline drill campaign as key toward commercial-scale discovery

    Noronex exits DorWit, its first Namibian copper projects

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Elevate grows Namibian uranium footprint to 116 million pounds

by Editor
April 28, 2026
in Uranium
0
Public review opens for Koppies West uranium project application
534
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium Ltd grew its Namibian uranium footprint to more than 116 million pounds U₃O₈, drilled 27,851 metres in three months and retained A$34 million cash.

The March 2026 quarter marked one of the company’s most active exploration periods in Namibia, with 788 holes completed across its Marenica, Namib IV and Capri prospects.

Of the total drilling, 518 holes for 20,248 metres were completed at Marenica, 203 holes for 5,725 metres at Namib IV and 67 holes for 1,878 metres at Capri.

A major highlight was the expansion of the Koppies Uranium Project, where the total mineral resource increased to 76.2 million pounds U₃O₈ at an average grade of 186 ppm, following the addition of a maiden resource at Namib IV.

The Namib IV deposit contributed 10.1 million pounds U₃O₈ from 29.5 million tonnes grading 155 ppm, adding fresh scale to the Koppies district, which already includes the main Koppies resource and Hirabeb deposit.

At the nearby Marenica Uranium Project, Elevate reported a significant upgrade to 40.2 million pounds U₃O₈ at 185 ppm, with the average grade doubling from the previous 93 ppm estimate after a re-evaluation of more than 5,000 historical drill holes.

The updated Marenica resource includes 15.2 million tonnes in the indicated category at 200 ppm and 84.8 million tonnes in the inferred category at 180 ppm, providing the company with a stronger development platform as it advances technical studies.

Elevate said several mineralised zones were excluded from the revised estimate because historical drilling was too widely spaced. Infill drilling began in February 2026 in Areas A and B, with a further updated resource expected during the June quarter. Separate programmes are also underway to convert inferred resources into indicated status.

The company is also advancing its proprietary U-pgrade™ beneficiation technology, which upgrades low-grade uranium ore by removing waste material before leaching. However, pilot plant commissioning has taken longer than expected, with results now expected in August 2026 after management and operational changes at the Namibian plant.

Despite the delay, Elevate said previous bench-scale test results remain valid and that it remains fully funded to complete optimisation work and generate data for future technical studies.

The company spent A$3.33 million on exploration during the quarter while maintaining A$34 million in cash, leaving it well-funded to continue drilling and advancing projects.

Share214Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

October 16, 2026
Deep Yellow locks in water, local ownership ahead of Tumas investment decision

Deep Yellow postpones Tumas investment decision beyond 2026

October 16, 2026
Midas kicks off major drill campaign at Otavi Copper Project

Midas finds multiple high-grade copper zones at Deblin near Otavi

October 15, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In