• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, October 19, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Deep Yellow postpones Tumas investment decision beyond 2026

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas finds multiple high-grade copper zones at Deblin near Otavi

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval allocates US$7.1m to Namibia copper exploration

    Madison Metals starts drilling at Khan Project in Namibia

    Critical One plans Critical Two Energy for Namibian uranium assets after failed US$3.5m sale

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast commits N$13.75m to uranium exploration near Langer Heinrich

    Higher uranium prices cushion 19% production drop at Langer Heinrich

    Higher uranium prices cushion 19% production drop at Langer Heinrich

    Arkle brings forward second uranium target after encouraging Namibia drilling

    Arkle finds uranium along 2.9km stretch near Trekkopje

    Keras becomes Okopa after securing 51% stake in Cornerstone Mining

    Keras becomes Okopa after securing 51% stake in Cornerstone Mining

    Noronex sees Powerline drill campaign as key toward commercial-scale discovery

    Noronex exits DorWit, its first Namibian copper projects

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Northern Graphite spent C$2.1m on Okorusu plant relocation

by Editor
September 1, 2026
in News
0
British Virgin Island-registered Chinese company acquires Okorusu Fluorspar
506
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Northern Graphite spent C$2.1 million during the second quarter of 2026 on the relocation of the former Okorusu processing plant, as the Canadian miner continued preparations to bring its Namibian graphite operations back into production.

The company disclosed the expenditure in its second-quarter results released on Tuesday, saying Rotary Engineering Services of Namibia dismantled the processing plant and transported it from Okorusu for future reassembly.

Northern said the C$2.1 million expenditure related to the relocation contributed to a C$3 million net loss for the three months ended 30 June 2026, compared with a C$1 million loss during the corresponding period last year.

The increased loss also reflected a C$1.3 million increase in care and maintenance expenses and C$3.7 million in non-cash items, including foreign exchange losses, interest accretion, stock-based compensation and depreciation.

The impact was partly offset by a C$6.4 million increase in licensing and other revenue during the quarter.

Northern’s latest disclosure puts a figure to the expenditure associated with moving the processing infrastructure, after the physical relocation was completed during the second quarter.

The Okorusu processing plant originated from the former Okorusu fluorspar operation north of Otjiwarongo, which for decades produced acid-grade fluorspar before mining operations ceased.

The processing infrastructure was later adapted for graphite processing and became part of the Namibian mining assets that Northern Graphite acquired from French industrial minerals group Imerys in 2022.

Under the previous operating configuration, graphite ore was transported to the Okorusu facility for processing, separating the mining and processing operations and adding a haulage component to production costs.

Northern subsequently opted to relocate the processing equipment rather than retain that operating configuration.

The company said an August 2023 Preliminary Economic Assessment by CREO Engineering Solutions supported its decision, finding that relocating the processing plant was expected to reduce operating costs, improve sustainability and enhance the operation’s longer-term expansion potential.

The relocation involved dismantling the Okorusu equipment before transporting it to its new location for future reassembly.

Northern’s second-quarter results show the company recorded no graphite sales or mine revenue during the period, although it generated C$8.9 million in other revenue, including C$8.3 million from an agreement to transfer carbon-material processing technology to a third party.

The company ended June with C$200,000 in cash and cash equivalents, compared with C$1.1 million at the end of March.

Northern is pursuing a broader strategy to increase natural graphite production and develop downstream battery materials, with its Namibian processing infrastructure as part of those plans.

Share202Tweet127
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
ReconAfrica moves into Etosha-Okavango basin onshore Angola

ReconAfrica eyes first Namibian gas production by 2028

October 19, 2026
African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

October 16, 2026
Deep Yellow locks in water, local ownership ahead of Tumas investment decision

Deep Yellow postpones Tumas investment decision beyond 2026

October 16, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In