• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, August 16, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx nears end of Haib infill drilling as resource update looms

    John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

    Forsys becomes Asarian Energy, targets uranium expansion beyond Namibia

    Union warns workers risk being left behind as mining changes

    Union warns workers risk being left behind as mining changes

    Midas takes 6 months from acquisition to drilling

    Midas hits 35.6m at 3.35% copper at Deblin near Otavi

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Appian makes Namibia its biggest global mining investment destination

    Namibia must develop more investment-ready mining projects, says Appian

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Graphite

Okanjande plant relocation 60% complete as Northern targets 2027 mine restart

by Editor
June 2, 2026
in Graphite
0
Northern Graphite plans restarting Okanjande in 2027
524
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Northern Graphite says work to relocate processing infrastructure to its Okanjande graphite mine in Namibia is now 60% complete as the company advances plans to restart production in late 2027 and position the operation as a key supplier to international battery materials markets.

The Canadian company disclosed that it has begun relocating processing facilities from the former Okorusu mine site to Okanjande, with the Namibian contractor Rotary Engineering Services responsible for dismantling, transporting, and reassembling the remaining plant infrastructure.

According to the company, the relocation project is expected to be completed in June 2026 and represents another step towards the resumption of graphite production at Okanjande.

Northern said relocating the processing plant directly to the mine site is expected to lower operating costs, improve project sustainability and create opportunities for future expansion.

The restart of Okanjande forms part of a broader strategy to establish an integrated graphite and battery materials business spanning Africa, North America and the Middle East.

The company is targeting a late-2027 restart of mining operations in Namibia to supply graphite concentrate to a planned Battery Anode Material (BAM) facility in Yanbu, Saudi Arabia. Production at the Saudi facility is expected to begin in 2028.

Northern has previously announced plans to develop the BAM facility through a joint venture with Saudi Arabia’s Obeikan Investment Group. The proposed plant is expected to produce battery anode materials for lithium-ion batteries used in electric vehicles and energy storage systems.

The company views Okanjande as a strategically important asset within Western governments’ and manufacturers’ efforts to diversify critical mineral supply chains away from China, which currently dominates global graphite processing and battery anode production.

Northern said Okanjande benefits from several competitive advantages, including a high-quality graphite resource, proximity to the deep-water port of Walvis Bay and a shorter development timeline than many competing graphite projects globally.

The company believes these attributes position the mine to serve customers in North America, Europe and the Middle East while supporting the development of alternative graphite supply chains.

Northern Graphite chief executive officer Hugues Jacquemin said the company had entered a critical phase in its development.

“Northern has entered a pivotal stage in its evolution, with a stronger balance sheet, advancing operations and a clear path toward becoming an integrated global graphite and battery materials producer,” Jacquemin said.

“Over the coming quarters, we expect to restart production at Lac des Iles, continue advancing toward a final investment decision for our planned BAM facility in Yanbu and further position Okanjande as a future source of scalable graphite production.”

He said the company’s projects were laying the foundation for Northern to become a supplier of critical materials to markets seeking secure, independent supply chains.

Okanjande, located near Otjiwarongo, remains Namibia’s only known graphite mine and is expected to play an increasingly important role as demand for battery minerals grows globally.

Share210Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kokoseb plans 130km desalinated water pipeline from Trekkopje

Kokoseb plans 130km desalinated water pipeline from Trekkopje

August 15, 2026
Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

August 15, 2026
Sprott’s Nam exposure set to reach US$432.5m

Sprott’s Nam exposure set to reach US$432.5m

August 15, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In