• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, August 14, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

    Forsys becomes Asarian Energy, targets uranium expansion beyond Namibia

    Union warns workers risk being left behind as mining changes

    Union warns workers risk being left behind as mining changes

    Midas takes 6 months from acquisition to drilling

    Midas hits 35.6m at 3.35% copper at Deblin near Otavi

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Appian makes Namibia its biggest global mining investment destination

    Namibia must develop more investment-ready mining projects, says Appian

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Botshiwe urges faster reforms to unlock mining investment

    ECC delays holding back mining investment, Chamber warns

    Government should let business do business, says Swakop Uranium

    Government should let business do business, says Swakop Uranium

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Elevate appoints Namibian operations manager as U-pgrade™ pilot plant targets August 2026 results

by Editor
April 9, 2026
in News
0
Beneficiation breakthrough with Elevate’s U-grade™
547
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium Limited has appointed a Namibian national as operations manager for its U-pgrade™ pilot plant programme in Namibia, as the company moves toward steady-state operations and targets results in August 2026.

The newly appointed metallurgist brings local expertise and industry networks in engineering, equipment supply and metallurgical support, with the company saying the strengthened leadership has already improved operating protocols and introduced a more structured approach to circuit optimisation.

The operational team has been further reinforced with additional Namibian metallurgical personnel to support consistent plant performance and the generation of high-quality data.

Managing director Murray Hill has been in-country throughout March and April and will continue to provide day-to-day oversight as the company works toward achieving steady-state operations.

Elevate said it has made “significant advances” in recent weeks, including reinforcing standard operating procedures and identifying mechanical and electrical modifications to enhance circuit performance.

The company confirmed that previously announced bench-scale testwork results remain valid and are not affected by delays in the pilot plant reaching steady-state conditions.

Following a detailed review of the programme, Elevate now expects to release pilot plant results in August 2026, reflecting the time required to stabilise operations, optimise plant configuration and process ore through the circuit.

The pilot plant is designed to demonstrate the company’s proprietary U-pgrade™ beneficiation process, which aims to upgrade uranium ore before downstream processing and to support future technical studies.

Elevate said it remains fully funded and positioned to deliver representative results as it advances its Namibian uranium projects.

Share219Tweet137
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Wia Gold says it has enough funding to develop Kokoseb

Wia Gold says it has enough funding to develop Kokoseb

August 13, 2026
John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

Forsys becomes Asarian Energy, targets uranium expansion beyond Namibia

August 12, 2026
Wia lines up US$375m Sprott package for US$475m Kokoseb mine

Wia lines up US$375m Sprott package for US$475m Kokoseb mine

August 11, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In