• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, April 28, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow says Tumas engineering now more than 60% complete

    Rhino drills appraisal well to test Capricornus oil extension

    Rhino drills appraisal well to test Capricornus oil extension

    Prospect Resources ‘forgotten’ lithium project

    Prospect Resources seeks partners for Omaruru lithium project after exploration halt

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast Uranium appoints South African firm Practara to fast-track Namibia resource reports

    Nyambe first African to be appointed international energy negotiators president-elect

    SNC advised BP to acquire 60% operating interest in PELs 97, 99 and 100 in Walvis Basin

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Elevate appoints Namibian operations manager as U-pgrade™ pilot plant targets August 2026 results

by Editor
April 9, 2026
in News
0
Beneficiation breakthrough with Elevate’s U-grade™
527
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium Limited has appointed a Namibian national as operations manager for its U-pgrade™ pilot plant programme in Namibia, as the company moves toward steady-state operations and targets results in August 2026.

The newly appointed metallurgist brings local expertise and industry networks in engineering, equipment supply and metallurgical support, with the company saying the strengthened leadership has already improved operating protocols and introduced a more structured approach to circuit optimisation.

The operational team has been further reinforced with additional Namibian metallurgical personnel to support consistent plant performance and the generation of high-quality data.

Managing director Murray Hill has been in-country throughout March and April and will continue to provide day-to-day oversight as the company works toward achieving steady-state operations.

Elevate said it has made “significant advances” in recent weeks, including reinforcing standard operating procedures and identifying mechanical and electrical modifications to enhance circuit performance.

The company confirmed that previously announced bench-scale testwork results remain valid and are not affected by delays in the pilot plant reaching steady-state conditions.

Following a detailed review of the programme, Elevate now expects to release pilot plant results in August 2026, reflecting the time required to stabilise operations, optimise plant configuration and process ore through the circuit.

The pilot plant is designed to demonstrate the company’s proprietary U-pgrade™ beneficiation process, which aims to upgrade uranium ore before downstream processing and to support future technical studies.

Elevate said it remains fully funded and positioned to deliver representative results as it advances its Namibian uranium projects.

Share211Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Public review opens for Koppies West uranium project application

Elevate grows Namibian uranium footprint to 116 million pounds

April 28, 2026
Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

Galp confirms three-well drilling and testing campaign for Mopane

April 28, 2026
Deep Yellow says Tumas engineering now more than 60% complete

Deep Yellow says Tumas engineering now more than 60% complete

April 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In