• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, September 23, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Ongombo copper mine owner secures £1m convertible loan

    Xinhai Ongombo deal meets all conditions

    Sultan Resources enters Namibia staking claim in the Damara Gold Belt

    Sultan raises A$1.3m to start Namibia copper-gold exploration

    Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

    Stamper cuts Namibia oil asset cash bill by US$750,000

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx hits 438m at 0.40% CuEq as Haib PFS nears

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    SciAps takes real-time mineral analysis deeper into African exploration

    SciAps takes real-time mineral analysis deeper into African exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    RCC board investigates procurement behind N$30m fuel deals

    RCC board investigates procurement behind N$30m fuel deals

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

by Editor
April 8, 2026
in Oil & Gas
0
Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin
523
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Oregen Energy has signed a non-binding letter of intent to evaluate an investment in Petrovena Energy, targeting additional exposure to Namibia’s Orange Basin through a newly awarded offshore block.

Petrovena has received an award letter to enter into a petroleum agreement for Block 2812Ab, a 2,742km² licence in the Orange Basin.

If the deal proceeds, Oregen will expand its footprint beyond its existing 33.95% indirect interest in Block 2712A (PEL 107), where it already holds a significant position through WestOil Ltd.

The targeted block is located northwest of TotalEnergies’ Venus discovery area and within the same geological trend as other major finds in the basin.

Oregen said the potential investment forms part of its strategy to build a larger position in Namibia’s offshore oil sector, with technical evaluation and negotiations now underway.

Share209Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Ongombo copper mine owner secures £1m convertible loan

Xinhai Ongombo deal meets all conditions

September 23, 2026
Sultan Resources enters Namibia staking claim in the Damara Gold Belt

Sultan raises A$1.3m to start Namibia copper-gold exploration

September 23, 2026
Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

Stamper cuts Namibia oil asset cash bill by US$750,000

September 22, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In