• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, June 8, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    China National Nuclear Corporation cleared to partner with Bannerman in Etango Uranium Project

    China National Nuclear Corporation cleared to partner with Bannerman in Etango Uranium Project

    British Virgin Island-registered Chinese company acquires Okorusu Fluorspar

    British Virgin Island-registered Chinese company acquires Okorusu Fluorspar

    London-listed Arkle buys Namibia uranium stake for N$49m

    Arkle brings in London mining broker as Namibia uranium push gathers pace

    bp to launch large-scale 3-D seismic survey in Walvis Basin before end of 2026

    bp to launch large-scale 3-D seismic survey in Walvis Basin before end of 2026

    Koryx Copper Resources’ Haib Mine: One of the oldest copper deposits in Africa

    Haib expected to process 40 million tonnes of material after redesign

    Tower Resources bets big on Walvis Basin potential

    Tower Resources raises £1.87m through 2 share subscriptions

    Nasan Energies takes over divested Engen and Shell service stations

    Nasan Energies takes over divested Engen and Shell service stations

    TotalEnergies buys 19,89% combined interest in Impact Oil’s Blocks 2912 and 2913B in Orange Basin

    Impact sheds South African assets to focus on Namibia’s Venus project

    Kaoko Metals launches IPO to fund copper exploration in northern Namibia

    Namibia turning explorers into market winners, says FitzGerald

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Haib Copper resource jumps to 3.5Mt as Koryx cuts strip ratio

by Editor
March 25, 2026
in Copper
0
Drilling program at Koryx Copper’s Haib mine continues
509
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Koryx Copper has increased contained copper at its Haib project in southern Namibia to 3.5 million tonnes, following an updated mineral resource estimate that also cut the stripping ratio nearly in half and extended the mine life beyond three decades.

The company reported 2.09 million tonnes of contained copper in the Indicated category and 1.385 million tonnes in the Inferred category, alongside significant by-product credits of 487,900 ounces of gold and 103.6 million pounds of molybdenum in Indicated resources.

The updated resource, dated March 2026, reflects a major revision from the previous 2025 estimate, driven by the inclusion of gold and molybdenum, expanded low-grade tonnage and refined geological modelling.

Copper equivalent grades in the high-grade zones increased to about 0.40% CuEq, while total mineralised material expanded sharply.

At the same time, the project’s stripping ratio was reduced from 1.74 to 0.92, significantly improving the expected economics of a future open-pit operation.

Koryx said the updated model converted large volumes of previously classified waste into mineralised material, increasing the overall resource base and supporting a longer production profile.

The company now expects the Haib project’s life-of-mine to extend beyond 35 years, up from the previously estimated 24 years.

Haib is being developed as a large-scale open-pit sulphide operation with an envisaged average annual production rate of about 92,000 tonnes of copper concentrate, using conventional crushing, milling and flotation processing.

The deposit, located in southern Namibia, is one of the oldest known porphyry copper systems globally and has been drilled extensively, with more than 120,000 metres of historical drilling completed since the 1970s.

Koryx said ongoing drilling will further expand and refine the resource base, with 14 drill rigs expected to complete about 55,000 metres of drilling by mid-2026.

Results from this programme will feed into another resource update and underpin a Preliminary Feasibility Study planned for the fourth quarter of 2026.

Recent metallurgical test work has also indicated potential for further grade improvements through ore sorting technologies, which could reduce processing costs and enhance recoveries.

The company said the combined impact of higher grades, additional by-product credits, reduced stripping requirements and longer mine life is expected to deliver a “step-change” improvement in project economics.

Koryx President and CEO Heye Daun said the updated resource demonstrates both the scale and consistency required for Haib to become a long-life copper operation.

“We are very pleased with the large improvement and refinement of the Haib MRE… increasing the total copper inventory from 2.6Mt to 3.5Mt while also reducing the expected stripping ratio,” Daun said.

The company is advancing the project through feasibility stages as it positions Haib as a potential large-scale copper producer within Namibia’s growing base metals sector.

Share204Tweet127
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kendrick sees world-class rare earth potential emerging Kieshöhe Project near Lüderitz

Kendrick sees world-class rare earth potential emerging Kieshöhe Project near Lüderitz

June 8, 2026
Kameelburg delivers 99% strontium recovery, 72% rare earth extraction

Kameelburg delivers 99% strontium recovery, 72% rare earth extraction

June 8, 2026
Serval confirms copper mineralisation in Namibia’s Kaoko Basin

Serval confirms copper mineralisation in Namibia’s Kaoko Basin

June 7, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In