• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, October 24, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Elevate considers developing Marenica, Koppies simultaneously

    Elevate seeks ratification of 4.7m shares issued to Xanthos in Marenica deal

    Namibia’s next multi-mineral growth province

    Chinalco’s US$15m Opuwo acquisition awaits Namibia, China approvals

    Hartree puts US$5m behind Hope and Gorob plant deal

    Bezant secures £4m to support Hope and Gorob production and expansion

    Amutse wants Etango uranium production before 2028

    Amutse wants Etango uranium production before 2028

    Bannerman approves FID for Etango, targets 2028 for yellow cake

    Bannerman approves FID for Etango, targets 2028 for yellow cake

    Paladin spends US$11m building uranium stockpiles at Langer Heinrich

    Paladin spends US$11m building uranium stockpiles at Langer Heinrich

    Safi Silver receives third US$3m payment from Kombat mine sale

    Namibia targets 57% processed mineral exports by 2030

    Petroleum Bill passes second reading with 50 votes

    Midas clears key hurdle in Otavi copper project acquisition

    Canadian firm targets 93,801 hectares in Namibia’s Otjozondjupa Region

    African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

    African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Haib Copper resource jumps to 3.5Mt as Koryx cuts strip ratio

by Editor
March 25, 2026
in Copper
0
Drilling program at Koryx Copper’s Haib mine continues
526
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Koryx Copper has increased contained copper at its Haib project in southern Namibia to 3.5 million tonnes, following an updated mineral resource estimate that also cut the stripping ratio nearly in half and extended the mine life beyond three decades.

The company reported 2.09 million tonnes of contained copper in the Indicated category and 1.385 million tonnes in the Inferred category, alongside significant by-product credits of 487,900 ounces of gold and 103.6 million pounds of molybdenum in Indicated resources.

The updated resource, dated March 2026, reflects a major revision from the previous 2025 estimate, driven by the inclusion of gold and molybdenum, expanded low-grade tonnage and refined geological modelling.

Copper equivalent grades in the high-grade zones increased to about 0.40% CuEq, while total mineralised material expanded sharply.

At the same time, the project’s stripping ratio was reduced from 1.74 to 0.92, significantly improving the expected economics of a future open-pit operation.

Koryx said the updated model converted large volumes of previously classified waste into mineralised material, increasing the overall resource base and supporting a longer production profile.

The company now expects the Haib project’s life-of-mine to extend beyond 35 years, up from the previously estimated 24 years.

Haib is being developed as a large-scale open-pit sulphide operation with an envisaged average annual production rate of about 92,000 tonnes of copper concentrate, using conventional crushing, milling and flotation processing.

The deposit, located in southern Namibia, is one of the oldest known porphyry copper systems globally and has been drilled extensively, with more than 120,000 metres of historical drilling completed since the 1970s.

Koryx said ongoing drilling will further expand and refine the resource base, with 14 drill rigs expected to complete about 55,000 metres of drilling by mid-2026.

Results from this programme will feed into another resource update and underpin a Preliminary Feasibility Study planned for the fourth quarter of 2026.

Recent metallurgical test work has also indicated potential for further grade improvements through ore sorting technologies, which could reduce processing costs and enhance recoveries.

The company said the combined impact of higher grades, additional by-product credits, reduced stripping requirements and longer mine life is expected to deliver a “step-change” improvement in project economics.

Koryx President and CEO Heye Daun said the updated resource demonstrates both the scale and consistency required for Haib to become a long-life copper operation.

“We are very pleased with the large improvement and refinement of the Haib MRE… increasing the total copper inventory from 2.6Mt to 3.5Mt while also reducing the expected stripping ratio,” Daun said.

The company is advancing the project through feasibility stages as it positions Haib as a potential large-scale copper producer within Namibia’s growing base metals sector.

Share210Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
VSA Capital CEO Andrew Monk tours Namibia’s mining projects

VSA forecasts Andrada’s Uis tin production to reach 1,872 tonnes by 2029

October 24, 2026
Elevate considers developing Marenica, Koppies simultaneously

Elevate seeks ratification of 4.7m shares issued to Xanthos in Marenica deal

October 24, 2026
Namibia’s next multi-mineral growth province

Chinalco’s US$15m Opuwo acquisition awaits Namibia, China approvals

October 24, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe