• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, August 19, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Amutse says Namibia must be ready onshore before first oil flows offshore

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    First oil cannot be Namibia’s destination – Shilunga

    First oil cannot be Namibia’s destination – Shilunga

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast identifies first uranium targets across three Erongo licences

    Bannerman targets over 80% Namibian workforce at Etango

    Bannerman targets over 80% Namibian workforce at Etango

    ReconAfrica moves Kavango West discovery towards appraisal well

    ReconAfrica moves Kavango West discovery towards appraisal well

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas hits 41m at 1.13% copper as Spaatzu extends to 1.2km

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Haib Copper resource jumps to 3.5Mt as Koryx cuts strip ratio

by Editor
March 25, 2026
in Copper
0
Drilling program at Koryx Copper’s Haib mine continues
515
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Koryx Copper has increased contained copper at its Haib project in southern Namibia to 3.5 million tonnes, following an updated mineral resource estimate that also cut the stripping ratio nearly in half and extended the mine life beyond three decades.

The company reported 2.09 million tonnes of contained copper in the Indicated category and 1.385 million tonnes in the Inferred category, alongside significant by-product credits of 487,900 ounces of gold and 103.6 million pounds of molybdenum in Indicated resources.

The updated resource, dated March 2026, reflects a major revision from the previous 2025 estimate, driven by the inclusion of gold and molybdenum, expanded low-grade tonnage and refined geological modelling.

Copper equivalent grades in the high-grade zones increased to about 0.40% CuEq, while total mineralised material expanded sharply.

At the same time, the project’s stripping ratio was reduced from 1.74 to 0.92, significantly improving the expected economics of a future open-pit operation.

Koryx said the updated model converted large volumes of previously classified waste into mineralised material, increasing the overall resource base and supporting a longer production profile.

The company now expects the Haib project’s life-of-mine to extend beyond 35 years, up from the previously estimated 24 years.

Haib is being developed as a large-scale open-pit sulphide operation with an envisaged average annual production rate of about 92,000 tonnes of copper concentrate, using conventional crushing, milling and flotation processing.

The deposit, located in southern Namibia, is one of the oldest known porphyry copper systems globally and has been drilled extensively, with more than 120,000 metres of historical drilling completed since the 1970s.

Koryx said ongoing drilling will further expand and refine the resource base, with 14 drill rigs expected to complete about 55,000 metres of drilling by mid-2026.

Results from this programme will feed into another resource update and underpin a Preliminary Feasibility Study planned for the fourth quarter of 2026.

Recent metallurgical test work has also indicated potential for further grade improvements through ore sorting technologies, which could reduce processing costs and enhance recoveries.

The company said the combined impact of higher grades, additional by-product credits, reduced stripping requirements and longer mine life is expected to deliver a “step-change” improvement in project economics.

Koryx President and CEO Heye Daun said the updated resource demonstrates both the scale and consistency required for Haib to become a long-life copper operation.

“We are very pleased with the large improvement and refinement of the Haib MRE… increasing the total copper inventory from 2.6Mt to 3.5Mt while also reducing the expected stripping ratio,” Daun said.

The company is advancing the project through feasibility stages as it positions Haib as a potential large-scale copper producer within Namibia’s growing base metals sector.

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Amutse says Namibia must be ready onshore before first oil flows offshore

Amutse says Namibia must be ready onshore before first oil flows offshore

August 19, 2026
Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

August 19, 2026
First oil cannot be Namibia’s destination – Shilunga

First oil cannot be Namibia’s destination – Shilunga

August 19, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In