• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, September 17, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Unicorn targets Klein Aub copper production within 12 months

    Unicorn targets Klein Aub copper production within 12 months

    Ongwe launches 5,000m maiden drilling at Nguni gold prospect

    Ongwe launches 5,000m maiden drilling at Nguni gold prospect

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

Antler Gold terminates Erongo Central Gold Project deal with Fortress Asset Management

by Editor
March 17, 2026
in Gold
0
Antler Gold to sign US$5m Erongo Gold project sale agreement to Fortress Asset Management on Sept. 16
537
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Antler Gold Inc. has terminated the sale of its Erongo Central Gold Project in Namibia following a settlement with Fortress Asset Management LLC and its assignee, Fortress Gold Ltd.

The Canadian-listed company said the settlement brings to an end the definitive asset purchase and sale agreement signed on 18 September 2024 and amended on 5 December 2024.

The agreement had provided for the disposal of the Erongo Project, but has now been cancelled without any admission of liability by any of the parties.

As a result of the termination, Antler’s subsidiary, Antler Gold Namibia (Proprietary) Limited, retains full ownership of the Erongo Central Gold Project.

The Erongo Project consists of five contiguous exclusive prospecting licences covering approximately 185 square kilometres in Namibia’s Damara Mobile Belt.

The licences cover about 28 kilometres of prospective strike length along the same geological trend that hosts the Twin Hills gold deposit.

Antler’s EPL 8010 directly borders the Twin Hills Mining Licence area, which hosts a gold resource of approximately 3.1 million ounces.

Following the termination of the agreement, Antler said it will consider next steps for the Erongo Project as part of its ongoing internal strategic review.

Antler Gold Inc. is listed on the TSX Venture Exchange and focuses on the acquisition and exploration of mineral projects in Africa.

Share215Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

September 17, 2026
Osino Resources on track to employ 1 000 Namibians at Twin Hills Gold Project

Shandong Gold Mining says Twin Hills gold mine to cost N$8.9bn

September 17, 2026
Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

September 16, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In