• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, September 23, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Ongombo copper mine owner secures £1m convertible loan

    Xinhai Ongombo deal meets all conditions

    Sultan Resources enters Namibia staking claim in the Damara Gold Belt

    Sultan raises A$1.3m to start Namibia copper-gold exploration

    Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

    Stamper cuts Namibia oil asset cash bill by US$750,000

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx hits 438m at 0.40% CuEq as Haib PFS nears

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    SciAps takes real-time mineral analysis deeper into African exploration

    SciAps takes real-time mineral analysis deeper into African exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    RCC board investigates procurement behind N$30m fuel deals

    RCC board investigates procurement behind N$30m fuel deals

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Orion Resources Partners sells Uis Mine tin royalty to Evolve Royalties in N$615m deal

by Editor
February 25, 2026
in News
0
European Investment Bank approves N$40m to fund Uis lithium project feasibility study
593
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

Orion Resource Partners is exiting its tin royalty exposure to Namibia’s Uis Mine after agreeing to sell the asset to Evolve Royalties in a US$32.5 million (about N$615 million) transaction that underscores the maturation of the once-dormant operation into a steady, cash-flowing asset.

The royalty being sold was created when Orion Resource Partners LP provided structured mine finance to Andrada.

Orion Resource Partners committed US$25 million (about N$470–475 million) to Andrada Mining through a structured financing package first announced in September 2022 and subsequently formalised in August 2023.

The funding comprised a tin gross revenue royalty, a convertible loan note, and an equity subscription, providing non-dilutive restart and growth capital for the Uis mine, with the royalty component forming part of the consideration now being sold to Evolve Royalties.

At the time, Uis had been closed for more than three decades and required capital for plant refurbishment, working capital and ramp-up.

Rather than taking equity control, Orion advanced funding in exchange for a sliding-scale gross-revenue royalty on tin production from Mining Licence ML-134.

The value of the original funding provided by Orion was not publicly disclosed. That structure gave Andrada access to non-dilutive development capital while granting Orion direct exposure to tin revenues, with higher royalty rates at lower production levels and step-down mechanisms as expansion milestones are reached.

Now, Orion has agreed to transfer that royalty to Evolve Royalties Ltd. for total consideration of US$32.5 million (about N$615 million), comprising US$22.5 million (about N$426 million) in cash and US$10.0 million (about N$189 million) in Evolve shares, subject to customary adjustments.

The transaction is expected to close in the first half of 2026, pending approval from the Canadian Securities Exchange and regulatory clearances in Namibia.

It carries an economically effective date of 1 January 2026, meaning Evolve will be entitled to a full year of royalty payments for 2026.

The royalty applies to all tin products produced from ML-134, a 19,700-hectare licence area that hosts extensive pegmatite mineralisation, including tin, tantalum, lithium and rubidium.

The royalty rate is degressive and linked to annualised contained tin production and future expansion stages at Uis.

At current production levels of roughly 1,000 to 1,100 tonnes of contained tin per year, the royalty sits at the upper end of its applicable range.

Using London Metal Exchange cash settlement prices of approximately US$45,000 per tonne (about N$850,000 per tonne), the royalty is expected to generate between US$4.0 million and US$4.5 million (about N$76 million to N$85 million) in revenue in 2026.

The LME cash settlement price for tin closed at US$47,500 per tonne (about N$900,000 per tonne) on 23 February 2026, highlighting the strong pricing environment supporting the asset.

Discovered in 1911 and developed into one of the world’s largest hard-rock open-pit tin mines in the mid-20th century, Uis mine was forced to close in 1990 following a collapse in global tin prices.

Andrada recommissioned and modernised the mine in 2022, positioning it as a key supplier in tightening global tin markets.

Operational performance since the restart has been steady.

In the quarter ended November 2025, Uis produced 255 tonnes of contained tin. For the first half of the 2026 financial year, production reached 511 tonnes at an all-in sustaining cost of US$24,808 per tonne (about N$468,000 per tonne), demonstrating improving stability as the operation advances toward expansion phases.

The sliding-scale royalty structure reflects those expansion ambitions. Until the first expansion milestone of 1,600 tonnes per annum is achieved, the royalty rate ranges between 9.63% and 5.13%, declining as production increases.

Subsequent milestones tied to 2,000 tonnes per annum and ultimately 9,800 tonnes per annum progressively reduce the rate to 0.86% after the final expansion stage. Additional reductions apply once payments have been made against 95,500 tonnes of contained tin.

The transaction changes only the identity of the royalty holder. The royalty terms remain intact, and the mine continues operating under the same licence and production framework.

Share237Tweet148
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Ongombo copper mine owner secures £1m convertible loan

Xinhai Ongombo deal meets all conditions

September 23, 2026
Sultan Resources enters Namibia staking claim in the Damara Gold Belt

Sultan raises A$1.3m to start Namibia copper-gold exploration

September 23, 2026
Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

Stamper cuts Namibia oil asset cash bill by US$750,000

September 22, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In