• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, October 12, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko’s first Chalkos drilling returns individual sample grading 6.42% copper

    Why Elizabeth Bay keeps coming back from the dead

    Why Elizabeth Bay keeps coming back from the dead

    Australian company Gibb River Diamonds acquires greenfield uranium projects in Erongo and Kunene

    Permit uncertainty pushes Gibb out of Namibia uranium exploration

    Skeleton Coast Uranium seeks C$5m for Namibia exploration

    Skeleton Coast Uranium seeks C$5m for Namibia exploration

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval confirms 37.8% copper and 573g/t silver at Kaoko Basin

    Koryx hits 969m at 0.27% copper equivalent at Haib

    Haib lifts processing capacity to 48Mtpa as Koryx targets November PFS

    Forsys’ Norasa in the making

    Asarian approves 4,500m Namibplaas drilling programme to upgrade 41.1Mlb uranium resource

    Elizabeth Bay Mine in trouble again

    US$50m investment targets restart of Elizabeth Bay diamond mine

    Andrada finds high-grade lithium beyond the main Lithium Ridge trend

    Andrada finds high-grade lithium beyond the main Lithium Ridge trend

    Eureka gets N$12.9m development funding push

    ReeXploration plans Phase 2 drilling after a 16.7 m uranium hit at Eureka

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Koryx hits 602m at 0.32% CuEq at Haib as company moves to convert mineral resources from inferred to indicated categoriy

by Editor
February 23, 2026
in Copper
0
New Haib Copper Project indicated and inferred estimates show decrease in tonnage but increase in value
522
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Koryx Copper Inc. says its ongoing infill and expansion drilling at the Haib Copper Project continues to confirm the scale, continuity and robustness of the deposit, with wide copper-equivalent intersections reported across multiple target areas as the company prepares an updated mineral resource estimate.

The latest results cover 13 diamond drill holes totalling 4,965 metres from the Phase 2 and Phase 3 drilling programme, aimed at tightening drill spacing within known mineralisation and testing lateral extensions of the planned open pit.

Among the most significant results, hole HM112 intersected 602 metres grading 0.32% copper equivalent (CuEq), including 272 metres at 0.44% CuEq and a higher-grade core of 40 metres at 0.50% CuEq.

HM121 returned 495 metres at 0.31% CuEq, including 284 metres at 0.42% CuEq, while HM117 delivered 184 metres at 0.51% CuEq, with multiple higher-grade intervals exceeding 1% CuEq.

The drill program has been planned to achieve a comprehensive conversion of all mineral resources from the Inferred to the Indicated category resource in order for all of the material to qualify for the PFS study update in the second half of 2026.

This entire drill program comprises 55,000m to be completed by the end of July 2026 to allow time for the assaying and updated resource modelling in 2026 Q3.

Koryx CEO Heye Daun said the latest drilling continues to validate both the size and consistency of mineralisation at Haib as the company advances towards feasibility.

“These latest assay results once again demonstrate and confirm the size, grade and robust copper mineralisation of the Haib deposit, with some excellent, wide and very consistent intercepts across multiple areas of the envisaged open pit,” Daun said.

He said the intersection widths and grades returned from both infill and step-out drilling further strengthen the project’s resource base and underpin confidence in the development strategy.

“The results highlight the ongoing success of our drill programme as we progress the technical work towards the highly anticipated pre-feasibility study targeted for late 2026,” Daun said.

Koryx said infill drilling has generally exceeded expectations in both intersection width and grade, while step-out holes have confirmed the presence of a broad, lower-grade mineralised halo surrounding higher-grade cores, supporting a large-scale open-pit development model.

Twelve drill rigs are currently active on site, with additional track-mounted rigs being mobilised to accelerate drilling.

Updated geological modelling, grade estimation, and the inclusion of molybdenum and gold as by-products have been completed, along with delineation of a large low-grade halo.

An updated Mineral Resource Estimate is expected to be published shortly, with the company targeting conversion of the entire resource to Indicated status by mid-2026.

Extensive metallurgical test work and infrastructure studies are ongoing ahead of a planned Pre-Feasibility Study towards the end of 2026.

Haib is an advanced, large-scale open-pit sulphide copper-molybdenum-gold porphyry project.

A Preliminary Economic Assessment released in September 2025 outlined average annual production of about 88,000 tonnes of copper in concentrate over a 24-year mine life, positioning Haib among Namibia’s most significant undeveloped copper assets.

Share209Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

Kaoko’s first Chalkos drilling returns individual sample grading 6.42% copper

October 12, 2026
Midas Otavi Copper Project acquisition cleared

Midas extends Spaatzu to 1.5km with grades of up to 2.39%

October 12, 2026
Arcadia finds funding partners for Swanson Tantalum Mine

Arcadia turns to European financiers as Swanson-Xinhai deal remains unresolved

October 10, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In