• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, April 29, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow says Tumas engineering now more than 60% complete

    Rhino drills appraisal well to test Capricornus oil extension

    Rhino drills appraisal well to test Capricornus oil extension

    Prospect Resources ‘forgotten’ lithium project

    Prospect Resources seeks partners for Omaruru lithium project after exploration halt

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast Uranium appoints South African firm Practara to fast-track Namibia resource reports

    Nyambe first African to be appointed international energy negotiators president-elect

    SNC advised BP to acquire 60% operating interest in PELs 97, 99 and 100 in Walvis Basin

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Koryx raises C$25 million to accelerate Haib copper studies and exploration

by Editor
January 12, 2026
in Copper
0
Drilling program at Koryx Copper’s Haib mine continues
540
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Koryx Copper has secured C$25 million in new funding through a bought-deal private placement, strengthening its balance sheet as it advances technical studies and exploration at the Haib Copper Project in southern Namibia.

The Vancouver-based company announced that it has entered into an agreement with Stifel Canada, acting as sole bookrunner alongside a syndicate of underwriters, to place 10.2 million common shares at a price of C$2.45 per share, generating gross proceeds of approximately C$25 million.

The offering is being completed under Canada’s listed issuer financing exemption, meaning the shares will not be subject to a statutory hold period once issued, subject to regulatory approvals.

Koryx has also granted the underwriters an option to purchase up to an additional 1.53 million shares at the same price, exercisable up to 48 hours before the closing of the transaction. If fully exercised, the option would further increase the size of the raise.

The company said the net proceeds will be directed toward advancing technical studies at Haib, continuing exploration on the property, and supporting working capital and general corporate purposes.

The financing is expected to close on or about 20 January 2026, subject to final approvals from the TSX Venture Exchange and other customary conditions.

Haib is Koryx’s flagship asset and one of Namibia’s largest undeveloped copper projects.

The project is a large, advanced-stage copper-molybdenum porphyry system located in southern Namibia and has a long history of exploration dating back to the 1960s.

More than 80,000 metres of drilling have been completed over several decades by major mining groups including Falconbridge, Rio Tinto and Teck, alongside extensive metallurgical testing and technical studies.

The current mineral resource at Haib stands at 414 million tonnes grading 0.35 percent copper in the indicated category and 345 million tonnes grading 0.33 percent copper in the inferred category, using a 0.25 percent copper cut-off.

The scale of the deposit supports the company’s strategy of positioning Haib as a potential long-life open-pit operation with sulphide flotation processing, with additional upside from potential heap leach copper production.

Koryx has been progressing further technical work aimed at refining development pathways, optimising project economics and de-risking future investment decisions.

The fresh capital provides the company with flexibility to accelerate engineering studies, advance metallurgical optimisation and expand exploration drilling to test extensions of the mineralised system.

Beyond Namibia, Koryx also holds two copper exploration licences on the Zambian Copperbelt, providing longer-term growth optionality. However, Haib remains the company’s primary development focus and the central driver of its valuation strategy.

Porphyry copper deposits of Haib’s geological age are rare globally and particularly uncommon in southern Africa.

Despite having undergone multiple metamorphic and deformation events over geological time, the deposit retains many of the classical alteration and mineralisation characteristics associated with large porphyry systems.

Copper mineralisation is dominated by chalcopyrite, with minor bornite and chalcocite, and limited secondary copper development due to the arid environment.

The successful completion of the bought deal places Koryx in a strong funding position as it moves into an intensified phase of technical evaluation and exploration.

The outcome of these programmes is expected to shape the project’s next development milestones and future financing strategy as the company works toward defining a viable development pathway for one of Namibia’s most significant undeveloped copper assets.

Share216Tweet135
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Public review opens for Koppies West uranium project application

Elevate grows Namibian uranium footprint to 116 million pounds

April 28, 2026
Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

Galp confirms three-well drilling and testing campaign for Mopane

April 28, 2026
Deep Yellow says Tumas engineering now more than 60% complete

Deep Yellow says Tumas engineering now more than 60% complete

April 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In