• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, August 14, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Koryx nears end of Haib infill drilling as resource update looms

    Koryx nears end of Haib infill drilling as resource update looms

    John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

    Forsys becomes Asarian Energy, targets uranium expansion beyond Namibia

    Union warns workers risk being left behind as mining changes

    Union warns workers risk being left behind as mining changes

    Midas takes 6 months from acquisition to drilling

    Midas hits 35.6m at 3.35% copper at Deblin near Otavi

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Appian makes Namibia its biggest global mining investment destination

    Namibia must develop more investment-ready mining projects, says Appian

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Botshiwe urges faster reforms to unlock mining investment

    ECC delays holding back mining investment, Chamber warns

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Midas kicks off major drill campaign at Otavi Copper Project

by Editor
December 1, 2025
in News
0
Midas kicks off major drill campaign at Otavi Copper Project
522
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Midas Minerals has begun a full-scale drilling campaign across its newly acquired Otavi Copper Project in Namibia, marking the company’s first operational move ahead of completing the 1,776-square-kilometre acquisition by the end of 2025.

Two diamond drill rigs are now turning on the high-grade T-13 copper-silver deposit, while a reverse-circulation rig has been deployed to the Spaatzu prospect, formerly known as Monty.

The company plans to extend drilling to the Deblin Segen, Devon, and Hartebeesport prospects once the operational schedule aligns with Namibia’s upcoming wet season.

The decision to launch drilling ahead of final transfer follows the receipt of all third-party approvals in October.

The Otavi Project is already known for some of Namibia’s strongest copper and silver intercepts, including past diamond drilling at T-13 that returned 17.2 metres at 7.24 per cent copper and 144.4 grams per tonne silver from 125.8 metres, as well as 45 metres at 2.43 per cent copper and 54.5 grams per tonne silver from 193 metres.

Other project-wide results have included 15 metres at 4.15 per cent copper with gold and silver at Deblin, 11.2 metres at 3.11 per cent copper with gold and silver at Hartebeesport, and 12.5 metres at 3.64 per cent copper at Segen-Driekoppies.

Midas has also accelerated regional work with extensive soil sampling and geological mapping across new target areas.

About 2,000 samples have already been processed using the company’s on-site portable XRF analyser, with certified laboratory results pending.

The company says this rapid geochemical screening is being used to prioritise bedrock targets for the newly deployed RC rig.

Managing director Mark Calderwood said the drilling programme is structured to move quickly from target definition to resource drilling.

He noted that the December–February wet season may create some access limitations but expects the three rigs to operate continuously, with more rigs likely to be added early in the first quarter of 2026.

Calderwood said the next twelve months are expected to deliver substantial news flow from Otavi’s high-grade copper-silver and copper-gold-silver systems, strengthened by the company’s healthy cash balance of approximately $15.3 million at the end of September 2025.

At the nearby South Otavi Project, where Midas holds an option to earn an interest, the company completed a one-hundred-and-forty-hole first-phase drilling programme totalling 3,693 metres in October.

Samples have been dispatched for laboratory analysis, and results are expected in January 2026. This follows earlier mapping and reviews of historic datasets, which highlighted extensive copper and gold anomalism across the tenement.

The Otavi district, one of Namibia’s oldest copper belts, remains underexplored with modern methods.

Midas believes that less than 40% of the tenure has previously been tested with systematic drilling.

With rigs now active and multiple high-grade prospects already established, the company views 2026 as a pivotal year in defining new copper, silver and gold resources across the project portfolio.

Share209Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Koryx nears end of Haib infill drilling as resource update looms

Koryx nears end of Haib infill drilling as resource update looms

August 14, 2026
Wia Gold says it has enough funding to develop Kokoseb

Wia Gold says it has enough funding to develop Kokoseb

August 13, 2026
John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

Forsys becomes Asarian Energy, targets uranium expansion beyond Namibia

August 12, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In