• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, October 29, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Former Debmarine executive takes charge of Bannerman’s Etango uranium project

    Former Debmarine executive takes charge of Bannerman’s Etango uranium project

    Reviving the Moosehead in PEL 87

    Pancontinental’s Namibia oil drilling plans hinge on finding a partner

    Connected Minerals starts Phase 2 drilling at Etango North-East’s Ondapanda prospect

    Connected Minerals puts two Namibian uranium projects on hold

    Kaoko Metals expands Namibia copper exploration to three drilling rigs

    Kaoko Metals expands Namibia copper exploration to three drilling rigs

    Six Namibian contractors involved in Etango’s US$353m uranium mine construction

    Six Namibian contractors involved in Etango’s US$353m uranium mine construction

    China secures 60% of Etango uranium production

    China secures 60% of Etango uranium production

    Botswana’s Motheo copper mine produces 13,341 tonnes in three months

    Botswana’s Motheo copper mine produces 13,341 tonnes in three months

    Otavi REE assets drive Cazaly’s recent trading level of A$0.032

    Cazaly identifies two copper drilling targets at Abenab North

    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow moves closer to Nedbank credit approvals for Tumas uranium mine

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Monitor to scout for well site on Owambo Basin’s PEL 93

by Editor
November 14, 2025
in Magazine
0
Monitor to scout for well site on Owambo Basin’s PEL 93
525
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

South African geophysical services company Xcalibur has been awarded a contract to carry out an airborne magnetic, radiometric, and scalar gravity survey across part of Petroleum Exploration Licence (PEL 93) in the Owambo Basin, northern Namibia.

The contract was issued by MEL Oil and Gas Exploration (Namibia) (Pty) Ltd, a subsidiary of Monitor Exploration Limited (MELN), acting on behalf of the PEL 93 Joint Venture.

PEL 93 lies in the heart of the Owambo Basin, an onshore sedimentary basin covering roughly 18,500 square kilometres in northern Namibia.

The licence, initially awarded in 2018, was granted a 12-month extension in July 2025 by Namibia’s Ministry of Mines and Energy, pushing its first renewal exploration period to October 2026.

The basin, geologically linked to hydrocarbon-bearing basins in southern Angola and the Congo Craton, remains one of Namibia’s least explored petroleum frontiers.

The PEL 93 Joint Venture includes MEL Oil and Gas Exploration (Namibia) (Pty) Ltd with a 55 per cent operating interest, 88 Energy Limited (ASX, AIM: 88E) with 20 per cent, Legend Oil Namibia (Pty) Ltd with 15 per cent, and Namcor, the Namibian state oil company, with 10 per cent.

Since securing the licence, MEL N has completed a series of exploration activities that have progressively refined its understanding of PEL 93’s subsurface potential.

These include passive seismic, soil-gas sampling, and remote-sensing studies, followed by a 200-kilometre 2D seismic survey completed in 2024.

Interpretation of that seismic data identified ten independent structural closures, some up to 100 square kilometres in area, with clear evidence of structural trapping and potential hydrocarbon charge.

The new airborne survey will build on these earlier results and mark the final step before drilling begins.

It will integrate all geological and geophysical datasets to pinpoint drilling targets.

The joint venture expects to commence its first exploration drilling campaign in the last quarter of 2026.

Preparations for the gravity and magnetic survey began in June and July 2025, involving extensive community-engagement sessions and an amendment to the existing Environmental Clearance Certificate (ECC) to include airborne gravity operations.

Xcalibur will conduct the survey using a single-engine Air Tractor aircraft equipped with its XMAG data-acquisition system, covering approximately 6,000 line kilometres. The aircraft will also deploy the iCORUS airborne gravity gradiometer and gravimeter, which offers an accuracy of about one mGal (RMS) and is designed to operate reliably under flight accelerations of up to 20 g—a significant advantage over conventional gradiometers in turbulent conditions.

Additional onboard instrumentation will include an Airborne Magnetometer, a Gamma Ray Spectrometer, GPS Navigation and Positioning Equipment, Attitude Sensor, and a Digital Data Acquisition System (XDAS). Xcalibur’s preliminary terrain and drape analysis indicates minimal operational constraints, allowing for uninterrupted data collection.

Data acquisition is expected to begin in January 2026, with final processed and interpreted results due by the end of February 2026.

The data will refine PEL 93’s subsurface model and guide final well-location selection.

“The airborne survey represents the last stage in enhancing our understanding of PEL 93’s subsurface potential,” the joint venture said in a statement. “Once interpreted, the data will provide the foundation for drilling our first well in late 2026.”

Monitor Exploration Limited, through MEL Namibia, has steadily built a comprehensive geological model of the Owambo Basin since 2018.

Its work to date—supported by the farm-in of 88 Energy and local partners—has positioned PEL 93 as one of Namibia’s most advanced onshore exploration licences.

The forthcoming Xcalibur survey is expected to culminate nearly seven years of exploration work, marking a decisive step toward testing the basin’s first modern exploration well and extending Namibia’s hydrocarbon frontier beyond the offshore Orange and Walvis Basins.

Share210Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Former Debmarine executive takes charge of Bannerman’s Etango uranium project

Former Debmarine executive takes charge of Bannerman’s Etango uranium project

October 29, 2026
Reviving the Moosehead in PEL 87

Pancontinental’s Namibia oil drilling plans hinge on finding a partner

October 29, 2026
Connected Minerals starts Phase 2 drilling at Etango North-East’s Ondapanda prospect

Connected Minerals puts two Namibian uranium projects on hold

October 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe