• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, October 28, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow moves closer to Nedbank credit approvals for Tumas uranium mine

    Woodside Energy opts out of PEL 87 farm-in deal before stop date of May 18, 2025

    Pancontinental proposes drilling first well at Namibia’s PEL 87 within two years

    Forsys’ Norasa in the making

    Asarian secures environmental approval for Norasa uranium project until 2029

    TotalEnergies warns delays will raise Venus oil project costs

    TotalEnergies warns delays will raise Venus oil project costs

    EU €1b funding package hangs in the balance after Namibia refused to sign the Samoa Agreement

    Walvis Bay to handle first 145,000-pound Malawi uranium shipment

    Elevate considers developing Marenica, Koppies simultaneously

    Elevate seeks ratification of 4.7m shares issued to Xanthos in Marenica deal

    Namibia’s next multi-mineral growth province

    Chinalco’s US$15m Opuwo acquisition awaits Namibia, China approvals

    Hartree puts US$5m behind Hope and Gorob plant deal

    Bezant secures £4m to support Hope and Gorob production and expansion

    Amutse wants Etango uranium production before 2028

    Amutse wants Etango uranium production before 2028

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Haib keeps climbing the global rankings

by Editor
November 5, 2025
in Magazine
0
Haib keeps climbing the global rankings
521
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Namibia’s Haib Copper Project, operated by Koryx Copper Inc., has once again secured its place among the world’s most significant copper drill results, cementing its reputation as one of Africa’s significant undeveloped porphyry deposits.

According to Fynd Exploration’s global copper leaderboard, Haib ranked third worldwide for the week of 27–31 October 2025, with a standout interval of 441 metres grading 0.22 per cent copper — a grade-width factor of 97 that underscores both continuity and scale.

This is not the first time the Namibian project has drawn international attention.

In August 2025, Haib topped Fynd’s global rankings with a remarkable intercept of 927 metres at 0.24 per cent Cu, one of the most extensive continuous copper intervals reported anywhere in the world that month.

The back-to-back recognition reflects the project’s technical consistency and the steady momentum of Koryx’s exploration work in southern Namibia’s ǁKaras Region, close to the Orange River and the South African border.

The oldest porphyry copper deposit

Haib holds a special place in geological history. First explored in the 1960s and often cited as the oldest known porphyry copper deposit on Earth, it represents an ancient hydrothermal system preserved in metamorphic rocks more than two billion years old. Successive exploration campaigns have confirmed that the mineralisation extends across several square kilometres, hosted in granodiorite intrusives with associated molybdenum and minor gold credits.

Today, Koryx Copper — formerly Trigon Metals — holds a 100 per cent interest in the project through its Namibian subsidiary.

More than 80,000 metres of historical and modern drilling have defined an extensive low- to medium-grade copper system suitable for open-pit development. An updated Preliminary Economic Assessment (PEA) released in 2025 refined the mine plan, processing parameters, and economic sensitivities, building on earlier technical studies and a robust resource base.

A resource built on scale

The Haib deposit hosts an indicated and inferred mineral resource totalling more than 2.2 billion tonnes at an average grade of 0.29 per cent Cu, containing roughly 6.4 million tonnes of copper metal — figures that place it among the largest copper inventories in sub-Saharan Africa.

While grades are modest by narrow-vein standards, Haib’s sheer tonnage, favourable metallurgy, and potential for phased, bulk mining operations make it highly attractive in an era of tightening global copper supply.

Recent drill campaigns have targeted depth extensions and flanking zones of the known mineralised zones, with consistent results demonstrating that copper grades remain stable over hundreds of metres.

The most recent intercepts reported in October 2025 confirm the presence of a broad, laterally continuous system with minimal structural disruption — an essential factor for low-cost open-pit extraction.

Momentum toward development

Koryx is now progressing a dual strategy of resource growth and project optimisation. Metallurgical testing has indicated recovery rates above 90 per cent using conventional flotation, while ongoing pit design work aims to lower stripping ratios and capital intensity.

The company has also initiated baseline environmental and community consultations in preparation for a Definitive Feasibility Study, the next step on the road to production.

In interviews, executives have hinted that the strong drill results and improved market conditions could accelerate financing discussions. Copper prices remain buoyant, driven by the rapid global build-out of renewable energy infrastructure and electric-vehicle manufacturing, both of which require massive amounts of conductive metals.

Haib’s prominence coincides with a broader copper revival in Namibia.

Projects such as Midas Minerals’ Otavi Copper Project, Golden Deeps’ Nosib and Abenab prospects, and the Kombat mine restart are collectively re-establishing the country’s copper credentials after a decade-long lull.

With the proper infrastructure and policy support, Namibia could soon emerge as a reliable mid-tier copper producer capable of supplying critical minerals markets in Europe and Asia.

For the government, Haib represents more than geology; it is a strategic asset that could anchor new downstream opportunities, from copper concentrate exports to refined metal and even cable manufacturing.

Recognition on the global stage

According to Fynd Exploration, Haib’s repeated presence in the global top-tier rankings is a rare achievement for an African project, demonstrating that world-class exploration results are not confined to the Americas or Australia.

Each new data point builds confidence that Haib’s enormous system can support a long-life, scalable mine capable of delivering sustainable returns.

As Namibia positions itself as a key player in the green-energy transition, Koryx’s consistent results at Haib serve as both a technical milestone and a national statement: Namibia’s copper story is far from over — in fact, it may just be beginning anew.

Share208Tweet130
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Golden Deeps four critical metals find

Golden Deeps reports 23.2% zinc, 9.2% copper at Graceland as deeper drilling continues

October 28, 2026
Jacaranda raises P78m, prepares to drill Botswana gold project

Jacaranda raises P78m, prepares to drill Botswana gold project

October 28, 2026
Column – Seizing the critical minerals moment will be Africa’s path to industrialisation

Column – Seizing the critical minerals moment will be Africa’s path to industrialisation

October 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe