• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, September 19, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Critical Metals

E-Tech Resources uncovers largest REE soil anomaly yet at Eureka Project

by Editor
October 1, 2025
in Critical Metals
0
E-Tech starts trenching program on Eureka Uranium Project to test new targets
533
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

E-Tech Resources has identified its largest rare earth element (REE) soil anomaly to date at the Eureka project in Namibia’s Erongo Mining District, expanding the company’s pipeline of high-priority exploration targets.

The Eureka deposit lies in the Southern Central Zone of the Neoproterozoic Damara Belt within Exclusive Prospecting License (“EPL”) number EPL 6762, which covers farms Eureka 99 and Sukses 90. E-Tech has also entered a definitive agreement to acquire an 85% interest in the permit EPL 8748 which lies adjacent to and surrounds the Company’s EPL 6762.

The new kilometer-scale anomaly lies about 3.5 kilometers east of Zone 1 and shows high concentrations of lanthanum (La) and cerium (Ce), considered pathfinders for neodymium (Nd) and praseodymium (Pr) — critical metals used in electric vehicles and wind turbines.

“The identification of this extensive REE anomaly highlights the outstanding exploration potential at Eureka,” said Christopher Drysdale, interim CEO of E-Tech Resources. “Systematic soil sampling has defined a kilometer-scale zone enriched in La and Ce, further supported by carbonatite float and visible monazite at surface. Importantly, this anomaly, which represents the largest soil anomaly defined on the project to date, adds to our growing pipeline of high-priority targets.”

The anomaly measures roughly 1,000 metres by 350 metres, far larger than the initial Zone 1 discovery, which was linked to a soil anomaly of just 116 metres by 60 metres. Soil sampling returned La values up to 1,702 ppm and Ce values up to 2,772 ppm. Fieldwork also confirmed the presence of carbonatite subcrop and monazite at surface.

E-Tech said ongoing work includes detailed mapping and grab sampling, with high-resolution ground magnetic surveys scheduled to refine drill targets. Drilling is expected to follow.

Soil sampling was conducted on a 40 by 40-metre grid using a SciAps X-555 portable XRF analyzer, which the company says has previously shown reliable results at Eureka when compared with laboratory assays. QA/QC measures included daily calibration, insertion of blanks and standards, and field preparation designed to minimise contamination.

Eureka’s systematic sampling program is being expanded to cover the entire dome area to identify further REE mineralisation zones.

Share213Tweet133
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Karibib Lithium Project site works to start in May, mining expected early 2025

Karibib lithium project’s long run of bad luck

September 19, 2026
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
Sultan Resources allocates N$13.3m to kickstart Namibia’s Damara Gold Project

Sultan applies for an additional 171 km² copper-gold ground in Kalkfeld

September 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In