• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, October 15, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Midas kicks off major drill campaign at Otavi Copper Project

    Midas finds multiple high-grade copper zones at Deblin near Otavi

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval allocates US$7.1m to Namibia copper exploration

    Madison Metals starts drilling at Khan Project in Namibia

    Critical One plans Critical Two Energy for Namibian uranium assets after failed US$3.5m sale

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast commits N$13.75m to uranium exploration near Langer Heinrich

    Higher uranium prices cushion 19% production drop at Langer Heinrich

    Higher uranium prices cushion 19% production drop at Langer Heinrich

    Arkle brings forward second uranium target after encouraging Namibia drilling

    Arkle finds uranium along 2.9km stretch near Trekkopje

    Keras becomes Okopa after securing 51% stake in Cornerstone Mining

    Keras becomes Okopa after securing 51% stake in Cornerstone Mining

    Noronex sees Powerline drill campaign as key toward commercial-scale discovery

    Noronex exits DorWit, its first Namibian copper projects

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko’s first Chalkos drilling returns individual sample grading 6.42% copper

    Why Elizabeth Bay keeps coming back from the dead

    Why Elizabeth Bay keeps coming back from the dead

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Lithium

Prospect Resources wants partners for Omaruru Lithium Project

by Editor
September 30, 2025
in Lithium
0
Prospect Resources wants partners for Omaruru Lithium Project
558
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Prospect Resources is seeking potential partnerships, joint ventures, or sale processes that could unlock Omaruru’s longer-term value once lithium market conditions improve.

The company has shifted strategy after completing its Phase 2 drilling programme and acquiring a full 100 per cent interest in the project, located near Wilhelmstal east of Karibib in Namibia’s Erongo Region.

The Omaruru Lithium Project is situated within the Karibib Pegmatite Belt. This area hosts over 65 lithium-caesium-tantalum (LCT) pegmatites, which have historically been worked for their lithium minerals and gemstones.

Prospect originally entered Omaruru through a joint venture with Osino Resources, which provided a pathway to earn a stake in the licences.

That arrangement culminated in March 2024, when Prospect acquired Osino’s remaining 60 per cent interest in Richwing Exploration, thereby consolidating full ownership of EPL 5533.

Exploration has advanced in several stages. Osino’s baseline programme, conducted between 2019 and 2021, included mapping, sampling, and 16 RC drillholes, totalling 1,942 metres at the Karlsbrunn pegmatite, which confirmed spodumene-bearing zones with intercepts ranging from 1.0 to 1.2 per cent Li₂O.

Prospect’s Phase 1 RC drilling in 2023 broadened the scope, returning strong results from Southern Brockmans, including 6 metres at 1.30 per cent Li₂O from 13 metres (within 14 metres at 0.79 per cent Li₂O), 8 metres at 0.99 per cent Li₂O from 6 metres, and 11 metres at 0.95 per cent Li₂O from 51 metres.

At Karlsbrunn, highlights included 10 metres at 0.88 per cent Li₂O from 35 metres and 11 metres at 0.80 per cent Li₂O from 35 metres. Metallurgical samples were also collected from Karlsbrunn, Brockmans and Hillside pegmatites.

The Phase 2 drilling programme in early 2024 expanded coverage across priority pegmatites and identified new anomalies through regional geochemical surveys, indicating the potential for previously unexplored blind pegmatites.

With ownership consolidated and the immediate joint venture obligations satisfied, Prospect has scaled back field expenditure to minimum licence-holding requirements.

The company has made it clear that its focus now rests on commercialisation strategies, seeking ways to leverage the confirmed mineralisation at Karlsbrunn, Brockmans, and Hillside into longer-term value for shareholders and Namibia’s growing battery minerals sector.

Share223Tweet140
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Midas kicks off major drill campaign at Otavi Copper Project

Midas finds multiple high-grade copper zones at Deblin near Otavi

October 15, 2026
Serval confirms copper mineralisation in Namibia’s Kaoko Basin

Serval allocates US$7.1m to Namibia copper exploration

October 14, 2026
Japan’s 50% Lofdal stake awaits final approvals

Lofdal’s 50% Japanese ownership deal delayed another 30 days

October 14, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In