• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, April 28, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow says Tumas engineering now more than 60% complete

    Rhino drills appraisal well to test Capricornus oil extension

    Rhino drills appraisal well to test Capricornus oil extension

    Prospect Resources ‘forgotten’ lithium project

    Prospect Resources seeks partners for Omaruru lithium project after exploration halt

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast Uranium appoints South African firm Practara to fast-track Namibia resource reports

    Nyambe first African to be appointed international energy negotiators president-elect

    SNC advised BP to acquire 60% operating interest in PELs 97, 99 and 100 in Walvis Basin

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Zinc

Rosh Pinah Zinc secures N$2.8b from Standard Bank to complete expansion

by Editor
September 23, 2025
in Zinc
0
Rosh Pinah Zinc secures N$2.8b from Standard Bank to complete expansion
536
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Rosh Pinah Zinc has secured a US$150 million (about N$2.8b) debt facility underwritten by Standard Bank to complete its long-awaited expansion project.

The financing will enable the mine, located in southern Namibia, to advance its Rosh Pinah 2.0 (RP2.0) project, designed to nearly double production capacity and extend the mine’s life.

RP2.0 represents a significant upgrade of the mine’s infrastructure and processing capacity.

The project will increase throughput from the current 0.7 million tonnes per annum to 1.3 million tonnes per annum, encompassing the construction of new processing facilities, a paste-fill plant to enhance ground stability and ore recovery, and a water-treatment plant to improve efficiency and environmental performance.

A new portal and decline will provide access to deeper ore bodies, while the expansion is also tied to the Rosh Pinah Solar Park, which is being increased from 5.4 MWp to 16.3 MWp to supply nearly a third of the mine’s electricity.

The investment is expected to transform production, with annual output forecast to rise to about 170 million pounds of contained zinc, up from roughly 100 million pounds today.

By introducing renewable energy into its operations, RP2.0 will also reduce energy costs by nearly 8% and cut carbon emissions by an estimated 14,000 tonnes per year.

Originally commissioned in 1969, the Rosh Pinah mine is now majority-owned by Appian Capital Advisory, which acquired a 90% interest in 2023 and re-energised the expansion.

The mine currently processes around 2,000 tonnes of ore per day, but RP2.0 will expand both processing and mining horizons, unlocking deeper zones such as WF3.

Construction has already achieved significant milestones, with completion targeted for Q3 2026, followed by ramp-up to full production.

The expansion aligns with Namibia’s broader vision of developing a globally competitive mining sector that incorporates modern technology, renewable energy, and sustainability objectives.

Share214Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Public review opens for Koppies West uranium project application

Elevate grows Namibian uranium footprint to 116 million pounds

April 28, 2026
Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

Galp confirms three-well drilling and testing campaign for Mopane

April 28, 2026
Deep Yellow says Tumas engineering now more than 60% complete

Deep Yellow says Tumas engineering now more than 60% complete

April 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In