• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, September 22, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

    Stamper cuts Namibia oil asset cash bill by US$750,000

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx hits 438m at 0.40% CuEq as Haib PFS nears

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    SciAps takes real-time mineral analysis deeper into African exploration

    SciAps takes real-time mineral analysis deeper into African exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    RCC board investigates procurement behind N$30m fuel deals

    RCC board investigates procurement behind N$30m fuel deals

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Forsys Metals delivers high-grade intercepts at Valencia deposit

by Editor
September 3, 2025
in Uranium
0
Forsys Metals delivers high-grade intercepts at Valencia deposit
512
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Drilling at Forsys Metals’ Valencia deposit in Namibia has returned a standout intercept of 623 ppm eU₃O₈ over 11 metres at the Jolie Zone, followed by 407 ppm over 53 metres and 364 ppm over 55 metres at Valencia Main, 338 ppm over 13 metres and 282 ppm over 54 metres at Valencia South, 271 ppm over 9 metres at Valencia West, and 184 ppm over 25 metres at Valencia East.

Since February 2025, Forsys has drilled 11,739 metres in 115 boreholes, with 10,832 metres of downhole gamma survey results processed across Valencia Main, Valencia South, Valencia West, Valencia East and the Jolie Zone.

At Valencia Main, 74 boreholes covering 5,787 metres were drilled to upgrade 26 million tonnes of Indicated Resource to Measured status.

Results included 407 ppm eU₃O₈ over 53 metres in VA25-229 and 364 ppm eU₃O₈ over 55 metres in VA25-264.

These infill holes continue to highlight the potential to add ore tonnage and reduce the stripping ratio within the modelled pit.

At Valencia South, two boreholes totalling 180 metres tested the down-plunge extension to the south of Valencia Main.

Drillhole VA25-289 returned 338 ppm eU₃O₈ over 13 metres and 282 ppm eU₃O₈ over 54 metres, aimed at increasing and upgrading the indicated resource in this area.

At Valencia West, seven boreholes covering 992 metres intersected mineralisation down dip and along strike. Results included 271 ppm eU₃O₈ over 9 metres in VA25-288. Drilling indicates mineralisation extends approximately 250 metres horizontally, remains open at depth, and may allow the Valencia Main pit to be extended about 150 metres westward.

The drill spacing is considered sufficient for this zone to be classified within the Indicated Resource category.

At Valencia East, 11 boreholes totalling 1,574 metres were drilled to extend and upgrade the historic resource. Drillhole VA25-295 returned 184 ppm eU₃O₈ over 25 metres.

Extension drilling to the south of the historic resource has identified additional mineralisation along strike and down dip, while infill drilling targets a potential upgrade to Indicated status.

At the Jolie Zone, 12 boreholes, totalling 2,009 meters, identified two sub-parallel mineralised intrusions approximately 50 metres apart.

Continuity of mineralisation has been confirmed over a strike length of approximately 350 metres. Highlights included 623 ppm eU₃O₈ over 11 metres in VA25-273.

These results enhance the potential to estimate additional mineral resources in the area.

Forsys Country Director Pine van Wyk said preparations have been completed at the Namibplaas uranium property, located nearby, where drilling is scheduled to begin in September 2025.

He noted that the extension and exploration drilling programs at both Valencia and Namibplaas are advancing steadily and will support the delivery of an updated mineral resource estimate for the Norasa Uranium Project.

Share205Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

Stamper cuts Namibia oil asset cash bill by US$750,000

September 22, 2026
Koryx nears end of Haib infill drilling as resource update looms

Koryx hits 438m at 0.40% CuEq as Haib PFS nears

September 22, 2026
Nandi-Ndaitwah courts US investment in Namibia’s critical minerals

Nandi-Ndaitwah courts US investment in Namibia’s critical minerals

September 21, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In