• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, October 29, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Reviving the Moosehead in PEL 87

    Pancontinental’s Namibia oil drilling plans hinge on finding a partner

    Connected Minerals starts Phase 2 drilling at Etango North-East’s Ondapanda prospect

    Connected Minerals puts two Namibian uranium projects on hold

    Kaoko Metals expands Namibia copper exploration to three drilling rigs

    Kaoko Metals expands Namibia copper exploration to three drilling rigs

    Six Namibian contractors involved in Etango’s US$353m uranium mine construction

    Six Namibian contractors involved in Etango’s US$353m uranium mine construction

    China secures 60% of Etango uranium production

    China secures 60% of Etango uranium production

    Botswana’s Motheo copper mine produces 13,341 tonnes in three months

    Botswana’s Motheo copper mine produces 13,341 tonnes in three months

    Otavi REE assets drive Cazaly’s recent trading level of A$0.032

    Cazaly identifies two copper drilling targets at Abenab North

    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow moves closer to Nedbank credit approvals for Tumas uranium mine

    Woodside Energy opts out of PEL 87 farm-in deal before stop date of May 18, 2025

    Pancontinental proposes drilling first well at Namibia’s PEL 87 within two years

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Lithium

Andrada and SQM begin 14,000m drill programme at Lithium Ridge

by Editor
September 3, 2025
in Lithium
0
Andrada and SQM begin 14,000m drill programme at Lithium Ridge
520
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining Limited has begun an ambitious exploration drilling campaign at its Lithium Ridge project in Namibia, in partnership with global lithium producer Sociedad Química y Minera de Chile SA (SQM) through its Australian subsidiary.

This marks the first stage of a three-phase earn-in agreement under which SQM will fund up to US$7 million in exploration to secure an initial 30% stake, with the potential to invest as much as US$40 million across all stages.

The current programme will drive 14,000 metres of oriented diamond drilling across priority lithium targets, supported by high-resolution geological mapping and sampling.

Early work has already confirmed the presence of new pegmatites containing visible spodumene mineralisation, adding to historical results of up to 2.13% Li₂O across a six-kilometre mineralised ridgeline.

Anthony Viljoen, Andrada’s Chief Executive Officer, described the launch as a pivotal moment: “The commencement of drilling at Lithium Ridge with our tier-1 joint-venture partner, SQM, is a significant step forward in unlocking one of Namibia’s most exciting lithium opportunities.

The encouraging historical results of up to 2.13% Li₂O along the 6km ridge line are already being complemented by a new geological mapping and sampling programme that has identified additional mineralised pegmatites containing visible spodumene crystals.

This strengthens our confidence in the scale and quality of the project.

The investment by SQM underscores Lithium Ridge’s potential and Namibia’s growing role in the global supply of critical minerals.

“We expect this programme to provide the foundation for fast-tracking the project towards development.”

Situated only 35 kilometres from Andrada’s producing Uis tin mine, the Lithium Ridge licence hosts multiple lithium-bearing pegmatites with tin and tantalum credits. The 14,000-metre drilling programme will comprise around 120 oriented holes aimed at proving depth extensions and continuity of mineralisation already mapped at surface.

Previous work demonstrated grades of up to 2.13% Li₂O with metallurgical recoveries of up to 80%, yielding a premium 6.8% Li₂O concentrate with low iron content.

For Andrada, the campaign is designed not only to unlock the full potential of the ridgeline but also to extend exploration into the wider licence area where fresh spodumene-bearing pegmatites have been identified.

If successful, this stage will provide the geological foundation to advance Lithium Ridge toward becoming a large-scale, high-quality lithium project that strengthens Namibia’s position as a future hub for critical minerals.

Share208Tweet130
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Reviving the Moosehead in PEL 87

Pancontinental’s Namibia oil drilling plans hinge on finding a partner

October 29, 2026
Connected Minerals starts Phase 2 drilling at Etango North-East’s Ondapanda prospect

Connected Minerals puts two Namibian uranium projects on hold

October 29, 2026
Kaoko Metals expands Namibia copper exploration to three drilling rigs

Kaoko Metals expands Namibia copper exploration to three drilling rigs

October 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe