• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, September 28, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Kombat workforce reaches 429, could grow to 600 by year-end

    Kombat workforce reaches 429, could grow to 600 by year-end

    14-year-old Namibian boy eyes nuclear career after Arctic expedition

    14-year-old Namibian boy eyes nuclear career after Arctic expedition

    BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

    BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

    Prospect receives two offers for the A$2.383m Omaruru lithium project

    Prospect receives two offers for the A$2.383m Omaruru lithium project

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko expands Otniel drilling to 15,000m as second rig starts at Donkey Hill

    Ongombo copper mine owner secures £1m convertible loan

    Xinhai Ongombo deal meets all conditions

    Sultan Resources enters Namibia staking claim in the Damara Gold Belt

    Sultan raises A$1.3m to start Namibia copper-gold exploration

    Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

    Stamper cuts Namibia oil asset cash bill by US$750,000

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx hits 438m at 0.40% CuEq as Haib PFS nears

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Andrada completes Uis jig plant, sets late-August commissioning to lift tin output

by Editor
August 21, 2025
in News
0
Andrada completes Uis jig plant, sets late-August commissioning to lift tin output
544
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining has finished building a second processing plant at its Uis mine in Namibia.
It will begin commissioning in the final week of August, a move the company says will materially increase tin production and advance its plan to double output.
The “Jig Plant” was delivered on time and within budget, the company said, calling it a low-cost upgrade that adds immediate capacity alongside the existing concentrator.
Chief executive Anthony Viljoen said the project is timed to capture a firming tin market and to push Uis toward a larger, more efficient operating base.
“The completion of the Jig Plant on time and within budget is a smart, low-cost upgrade that will immediately boost Uis tin production on the completion of commissioning.
“The plant is a key milestone towards doubling production and positions Andrada well to capture the benefits of a robust and strengthening tin market,” Viljoen said.
Built adjacent to the current processing facility, the new plant is modular and can run independently to avoid disrupting primary operations.
It has been designed for a nameplate capacity of 80 to 100 tonnes per hour and can process up to 40,000 tonnes of ore per month, with a targeted recovery of about 70 per cent.
Final operating parameters will be confirmed during the commissioning process.
Initial feed will come from nearby Uis pegmatites grading between 0.14 and 0.30 per cent tin, as well as existing stockpiles.
To supplement this, Andrada has secured an ore supply agreement with Goantagab Mining for up to 20,000 tonnes of ore at around 1.5 per cent tin.
The jig plant follows project milestones flagged earlier this year and is central to Andrada’s growth strategy at Uis, the company’s flagship operation in Namibia.
By adding parallel processing capacity, Andrada aims to increase throughput, improve recoveries from lower-grade sources, and reduce unit costs, while maintaining steady operation of the primary plant throughout the ramp-up.
Commissioning will test the plant’s circuits, validate recoveries and throughput, and integrate the new stream with mine scheduling and logistics.
Once commissioned, the additional capacity is expected to translate quickly into higher concentrate shipments, with the company guiding to a significant increase in tin output over the coming quarters.
Andrada, listed on AIM and the OTCQB, describes the Uis expansion programme as a platform for broader growth across its portfolio of critical raw materials in Namibia.
With construction now complete and commissioning imminent, the company’s near-term focus is on safely ramping the jig plant to nameplate and locking in the production gains it has signalled for 2025.

Share218Tweet136
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kombat workforce reaches 429, could grow to 600 by year-end

Kombat workforce reaches 429, could grow to 600 by year-end

September 28, 2026
14-year-old Namibian boy eyes nuclear career after Arctic expedition

14-year-old Namibian boy eyes nuclear career after Arctic expedition

September 26, 2026
BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

September 25, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In