• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, October 24, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Amutse wants Etango uranium production before 2028

    Amutse wants Etango uranium production before 2028

    Bannerman approves FID for Etango, targets 2028 for yellow cake

    Bannerman approves FID for Etango, targets 2028 for yellow cake

    Paladin spends US$11m building uranium stockpiles at Langer Heinrich

    Paladin spends US$11m building uranium stockpiles at Langer Heinrich

    Safi Silver receives third US$3m payment from Kombat mine sale

    Namibia targets 57% processed mineral exports by 2030

    Petroleum Bill passes second reading with 50 votes

    Midas clears key hurdle in Otavi copper project acquisition

    Canadian firm targets 93,801 hectares in Namibia’s Otjozondjupa Region

    African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

    African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

    Aldoro drills for copper-gold targets at Avondschaduw prospect near Kalkfeld

    Aldoro drills for copper-gold targets at Avondschaduw prospect near Kalkfeld

    Diamond industry faces familiar slump, but recovery may be different this time

    Diamond industry faces familiar slump, but recovery may be different this time

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Bezant Resources fundraises N$13.2m to support Hope & Gorob pre-development

by Editor
July 28, 2025
in News
0
Bezant Resources looks at establishing an open-pit copper operation at Hope & Gorob to run for 11 years
533
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Bezant secured a fundraising round of £560,000 (approximately N$13.2 million) in early 2025 to finance further project advancement and corporate requirements at its Hope & Gorob copper-gold project in Namibia—shares were issued in lieu of fees to directors and consultants to support pre-development stages.

This capital injection followed significant progress at the Hope & Gorob copper-gold project in Namibia, where the company holds a 70 percent interest through its subsidiary, Hope Namibia Mineral Exploration (Pty) Ltd.

Located within EPL 5796 in the mineral-rich Erongo Region, the project is now fully permitted.

The Ministry of Mines and Energy granted the Environmental Clearance Certificate in June 2025 and subsequently issued Mining Licence ML 246, valid until March 2040.

Bezant’s Hope & Gorob project contains an estimated 15 million tonnes of JORC-compliant Indicated and Inferred mineral resources, with approximately 190,000 tonnes of copper at an average grade of 1.42 percent.

The Hope deposit itself holds around 4.2 million tonnes at a higher grade of 1.7 percent copper, accounting for 28 percent of total resource tonnage and 37 percent of contained copper.

A 2024 mine scoping study confirmed the project’s viability, outlining a seven- to nine-year operational plan.

This includes a five-year open-pit mining phase followed by four years of underground mining at the Hope deposit. Projected production stands at 480,000 tonnes per annum from open-pit operations and 220,000 tonnes per annum from underground extraction of higher-grade ore.

To complement its mining strategy, Bezant finalised letters of intent in 2024 with contractors for mine development, plant construction, and an off-grid renewable energy solution.

These include a dry ore sorting facility to enhance processing efficiency and reduce water consumption. Engineering groups with a Namibian presence have been lined up to provide on-the-ground infrastructure and support services.

Bezant’s advancement of Hope & Gorob positions it as a future medium-scale copper-gold producer in Namibia.

With funding secured, permits granted, and technical studies validated, the company is moving into pre-construction and implementation phases, with the aim of contributing to Namibia’s expanding portfolio of copper assets in the coming years.

Share213Tweet133
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Amutse wants Etango uranium production before 2028

Amutse wants Etango uranium production before 2028

October 23, 2026
Bannerman approves FID for Etango, targets 2028 for yellow cake

Bannerman approves FID for Etango, targets 2028 for yellow cake

October 23, 2026
African Critical Elements targets Karibib lithium production within three years

African Critical Elements targets Karibib lithium production within three years

October 22, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe