• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, July 22, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Langer Heinrich produces 4.82 Mlb U₃O₈, sells 4.35 Mlb in June quarter

    Langer Heinrich produces 4.82 Mlb U₃O₈, sells 4.35 Mlb in June quarter

    Master Power Technologies unveils R50m state-of-the-art customer experience centre at New Midrand premises

    Master Power Technologies unveils R50m state-of-the-art customer experience centre at New Midrand premises

    Castrol changes ownership as bp streamlines business

    Castrol changes ownership as bp streamlines business

    Meren Energy says TotalEnergies has submitted Venus field development plan

    TotalEnergies secures approval for offshore licence swap

    Bannerman’s 16-year path to Namibia’s 4th uranium mine

    Approval for Chinese investment in Etango tied to jobs, local businesses

    Namibia Construction and Nexus Building win A$34 million Tumas contracts

    Namibia Construction and Nexus Building win A$34 million Tumas contracts

    Nandi-Ndaitwah proposes Angola-Namibia-South Africa power corridor

    Nandi-Ndaitwah proposes Angola-Namibia-South Africa power corridor

    Arkle brings forward second uranium target after encouraging Namibia drilling

    Arkle brings forward second uranium target after encouraging Namibia drilling

    ReconAfrica penetrates 400m hydrocarbon interval at Kavango West 1X

    ReconAfrica records first onshore hydrocarbon flow during Namibia production test

    Pancontinental sees over 20 billion barrels recoverable at PEL 87

    Pancontinental launches feasibility study to improve PEL 87 seismic data processing

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Koryx Copper raises N$135m to advance Haib Copper Project

by Editor
July 10, 2025
in Copper
0
Koryx Copper appoints four former Osino executives
516
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Koryx Copper Inc. has announced it will raise approximately C$10 million (about N$135 million) to fund further development of its Haib Copper Project in southern Namibia, one of Africa’s oldest known porphyry copper deposits.

Under a bought-deal agreement, Stifel Nicolaus Canada Inc. will act as lead underwriter and sole bookrunner for a syndicate purchasing 9,524,000 common shares at C$1.05 each (roughly N$14.20). The company intends to use the net proceeds to advance technical studies at Haib, continue exploration, and support working capital and general corporate purposes.

The offering includes an over-allotment option for underwriters to buy up to 15% more shares at the same price. It is expected to close on or about 30 July 2025, subject to regulatory approvals, including conditional approval from the TSX Venture Exchange.

Underwriters will receive a cash commission of up to 6% of gross proceeds (approximately C$600,000 or N$8.1 million) and compensation warrants equal to 3% of the shares sold, exercisable at the same price for 24 months.

Located in Namibia’s arid south near the Orange River, Haib is a large Paleoproterozoic porphyry copper-molybdenum deposit with a long history of exploration.

Koryx reported in a June 2024 press release that its current mineral resource estimate stands at 414 million tonnes grading 0.35 % copper in the Indicated category and 345 million tonnes at 0.33 % copper in the Inferred category, using a 0.25 % copper cut-off.

By mid‑2025, Koryx had completed over 11,000 m of a planned 55,000 m Phase 2 diamond drilling program, designed to upgrade resources and define structural controls on higher-grade mineralization.

Recent assays have reported strong intervals above the average grade, such as 88 m at 0.41 % copper and 228 m at 0.34 %, with local zones exceeding 0.9 % copper.

Metallurgical test work has delivered average flotation recoveries of ~89%, producing 20–25% copper concentrates, while testing continues on heap-leach potential and by-product recovery.

On-site infrastructure is expanding, with a field team of over 50 supporting four active drill rigs and additional rigs mobilizing.

Environmental baseline studies, water and power supply planning (with ~120 MW power and ~20 Mm³/year water requirements), and a mining licence application are all underway, as Koryx works toward completing an updated Preliminary Economic Assessment in 2025.

Haib is a potential long-life, low-cost copper operation critical to supporting the global energy transition while contributing to Namibia’s ambitions to develop its minerals sector.

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Langer Heinrich produces 4.82 Mlb U₃O₈, sells 4.35 Mlb in June quarter

Langer Heinrich produces 4.82 Mlb U₃O₈, sells 4.35 Mlb in June quarter

July 22, 2026
Aldoro secures A$4.3 million through convertible notes for Kameelburg project

Aldoro secures A$4.3 million through convertible notes for Kameelburg project

July 21, 2026
Namibia Critical Metals approves C$11 million to design Lofdal processing plant

Namibia Critical Metals approves C$11 million to design Lofdal processing plant

July 21, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In