• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, April 30, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

Rhino Resources signs up Northern Ocean’s Deepsea Mira for N$740m to spud Volans-1X this July

by Editor
July 9, 2025
in Oil & Gas
0
Rhino Resources signs up Northern Ocean’s Deepsea Mira for N$740m to spud Volans-1X this July
532
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Northern Ocean Ltd has signed a N$740 million drilling contract with Rhino Resources Namibia (Pty) Ltd for its semi-submersible rig Deepsea Mira to drill the Volans-1X exploration well in Namibia’s Orange Basin. The deal covers approximately 112 firm days and is set to start in mid-July 2025.

The contract includes one firm well for Rhino and another for a second operator, with options for up to three more wells. It ensures the Mira maintains continuous operations in Namibia after its previous campaign with TotalEnergies.

Northern Ocean CEO Arne Jacobsen said the agreement reflects a strong commitment to Namibia’s offshore sector, highlighting reduced mobilisation costs, support for local content, and operational continuity. He noted it will “ensure Deepsea Mira continues its operations in Namibia,” adding that Northern Ocean and Odfjell Drilling remain the only contractor with a continuous presence in the country over the past two years.

For Rhino, the Mira is central to its exploration plans on Petroleum Exploration Licence (PEL) 85. Volans-1X follows Capricornus-1X, drilled earlier in 2025, which encountered 38 metres of light oil net pay and put Rhino firmly on the Orange Basin map. Rhino CEO Travis Smithard called the Mira an “in-country rig of opportunity with high local content,” underlining the company’s commitment to Namibian development and local capacity.

Built in 2019, the Deepsea Mira is designed for harsh, ultra-deepwater environments, capable of drilling in depths up to 3,000 metres. Its deployment supports Namibia’s strategy to shift from frontier exploration to becoming a serious offshore producer by 2030.

Volans-1X is expected to spud in mid-to-late July 2025, with around 55 days of firm drilling planned. Success would help confirm PEL 85 as a commercial cluster, advancing Namibia toward first oil. Even if Volans does not meet expectations, Rhino has options for appraising earlier discoveries or testing new prospects, reflecting the flexibility built into its exploration strategy.

With the Mira secured and local bases in Walvis Bay, Swakopmund, and Lüderitz supporting operations, Rhino and Northern Ocean are firmly positioned in what is shaping up to be one of Africa’s most promising energy frontiers.

Share213Tweet133
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

April 30, 2026
Northern Graphite plans restarting Okanjande in 2027

Okanjande moves closer to restart after Northern clears US$22m debt burden

April 30, 2026
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In