• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, September 29, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Andrada lifts Uis tin output 13% ahead of N$98m plant upgrade

    Andrada lifts Uis tin output 13% ahead of N$98m plant upgrade

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    ReconAfrica finds gas with liquid potential at Kavango well

    Tower Resources bets big on Walvis Basin potential

    Tower Resources’ PEL96 farm-out reaches minister for final signature

    Kombat workforce reaches 429, could grow to 600 by year-end

    Kombat workforce reaches 429, could grow to 600 by year-end

    14-year-old Namibian boy eyes nuclear career after Arctic expedition

    14-year-old Namibian boy eyes nuclear career after Arctic expedition

    BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

    BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

    Prospect receives two offers for the A$2.383m Omaruru lithium project

    Prospect receives two offers for the A$2.383m Omaruru lithium project

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko expands Otniel drilling to 15,000m as second rig starts at Donkey Hill

    Ongombo copper mine owner secures £1m convertible loan

    Xinhai Ongombo deal meets all conditions

    Sultan Resources enters Namibia staking claim in the Damara Gold Belt

    Sultan raises A$1.3m to start Namibia copper-gold exploration

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

African Pioneer gets licence for Ongombo Copper-Gold Project

by Editor
June 27, 2025
in News
0
African Pioneer gets licence for Ongombo Copper-Gold Project
561
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

African Pioneer has received a licence for its Ongombo Copper-Gold Project in Namibia.
The licence 240 is valid until 2045.
African Pioneer holds an 85% stake in the project, located approximately 40 km northeast of Windhoek.
The issuance of the licence marks the final step in the government’s permitting process following the recent award of the Environmental Clearance Certificate (ECC No. 2302356 in March 2025.
African Pioneer executive chairman Colin Bird said this marks a significant milestone for African Pioneer, enabling us to transition from permitting into project execution.
Bird added that the substantial upgrade in mineral resources and the decision to initiate low-cost, open-pit mining as a ‘starter’ operation puts us on a fast-track path toward production.
“We look forward to advancing Ongombo into a key contributor to the copper and gold production in the Khomas Region of Namibia,” Bird said.
The updated mineral resource estimates for the Ongombo project, revised by Addison Mining Services (AMS) and reported on May 16, 2023, delineate a potential combined open pit and underground mining operation based on JORC-2012 resources of 5.7 Mt at 1.1% copper equivalent, 0.94% copper, and 0.23 g/t gold (indicated) (gross).
This resource includes 930 Kt at 0.57% copper and 0.19 g/t gold, with open-pit potential, and is believed to be amenable to a starter mine using lower-cost open-pit methods.
Significantly, the AMS update reports previously unstated inferred underground potential resources of 23 at 0.95% copper and 0.24 g/t gold.
African Pioneer is taking a modern, low-cost approach to ore processing. The company is trialling innovative ore-sorting technologies, including X-ray transmission (XRT) and laser-based methods, to improve efficiency and reduce water consumption—an essential consideration in Namibia’s arid climate. The plan is to pre-concentrate ore at the mine site and then send it to existing facilities for further processing, minimising the need for expensive new infrastructure.
To support this phase of development, the company raised nearly N$9.8 million (approximately £420,000) in early 2025. The funds will be used for infill drilling, project planning, and advancing the Environmental and Social Impact Assessment (ESIA), which is already at an advanced stage. African Pioneer is also in discussions with funding partners to secure additional capital for the construction phase.
The immediate next steps for the Ongombo project include finalising the ESIA, completing further drilling to refine the resource model, and advancing the engineering layout for a starter open pit and supporting infrastructure. The company is also developing cost models and assessing toll treatment options for the ore.
In summary, the Ongombo Project is progressing rapidly from exploration to development.
With substantial resources, regulatory approvals, innovative processing strategies, and investor backing, African Pioneer is positioning Ongombo as a flagship copper-gold asset in Namibia’s emerging mining landscape.

Share224Tweet140
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Andrada lifts Uis tin output 13% ahead of N$98m plant upgrade

Andrada lifts Uis tin output 13% ahead of N$98m plant upgrade

September 28, 2026
ReconAfrica targets October for 1,000m horizontal test at Kavango West

ReconAfrica finds gas with liquid potential at Kavango well

September 28, 2026
Tower Resources bets big on Walvis Basin potential

Tower Resources’ PEL96 farm-out reaches minister for final signature

September 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In