• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, May 3, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Celsius Resources progresses Opuwo Cobalt Project disposal plans

by Editor
June 17, 2025
in News
0
Celsius Resources progresses Opuwo Cobalt Project disposal plans
529
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Celsius Resources is progressing with plans to dispose of the Opuwo Cobalt Project in Namibia and focus on its flagship Maalinao-Caigutan-Biyog Copper-Gold Project in the Philippines.
The project is the largest cobalt deposit outside the Democratic Republic of the Congo (DRC).
The Opuwo Cobalt Group owns the Opuwo Cobalt Project, in which Celsius Resources has a 95% interest.
In March, Celsius Resources revalued the Opuwo Cobalt Group’s assets to US$3,017,035.
All current Opuwo Cobalt Group assets have been reclassified for carrying value as of June 30, 2024.
Celsius Resources acquired 100% of Opuwo Cobalt in 2017 to gain 76% of the Opuwo Cobalt Project’s exposure.
Celsius Resources’ interest in the Opuwo Cobalt increased in September 2017 when Gecko Holdings agreed to sell its 20 in Gecko Cobalt.
Gecko sold a 95% interest in three surrounding Opuwo region licenses to Celsius, covering approximately 782 km².
Celsius Resources entered into a non-binding agreement with Stewardship Investments regarding the disposal of its 95% stake in the Opuwo Cobalt Project in February 2025.
Opuwo Cobalt Project’s updated indicated and inferred Mineral Resource at Opuwo doubled to 225.5 million tonnes, grading 0.12% cobalt, 0.43% copper and 0.54% zinc.
Two hundred fifty-nine thousand tonnes of contained cobalt demonstrates the potential for Opuwo to be a significant future supplier of cobalt in the battery market.
Nine hundred seventy thousand tonnes of contained copper are anticipated to enhance the project’s viability, given current and forecast copper prices.
The Mineral Resource update is a key part of the technical and commercial re-evaluation of the Company’s Opuwo cobalt-copper project.
Completed nine diamond drill holes for future metallurgical optimisation work.
Drilling also confirmed the trend along the strike length of the modelled ore body, reinforcing the consistent nature of the Dolostone Ore Formation (DOF) and wider DOF mineralisation of the Opuwo Cobalt Deposit.
Preliminary roasting and tank leach test work results (from previous bulk samples) show encouraging results, with 95% cobalt and 98% copper recovery, which demonstrate that the Opuwo Ore is amenable to the Roasting and Tank Leach downstream process method.
Further optimisation flotation test works are in development, which may improve Cobalt recovery to approximately 85%, feeding into the engineering design criteria to update the 2018 Scoping Study.

Share212Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

April 30, 2026
Northern Graphite plans restarting Okanjande in 2027

Okanjande moves closer to restart after Northern clears US$22m debt burden

April 30, 2026
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In