• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, October 9, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval confirms 37.8% copper and 573g/t silver at Kaoko Basin

    Koryx hits 969m at 0.27% copper equivalent at Haib

    Haib lifts processing capacity to 48Mtpa as Koryx targets November PFS

    Forsys’ Norasa in the making

    Asarian approves 4,500m Namibplaas drilling programme to upgrade 41.1Mlb uranium resource

    Elizabeth Bay Mine in trouble again

    US$50m investment targets restart of Elizabeth Bay diamond mine

    Andrada finds high-grade lithium beyond the main Lithium Ridge trend

    Andrada finds high-grade lithium beyond the main Lithium Ridge trend

    Eureka gets N$12.9m development funding push

    ReeXploration plans Phase 2 drilling after a 16.7 m uranium hit at Eureka

    Hope and Gorob workforce reaches 130 as first ore nears

    Hope & Gorob starts commercial production, targets 9,000 tonnes in October

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas extends T-13 west with 22.6m at 6.01% CuEq

    Keras targets early copper production from Kaoko portfolio

    Keras targets early copper production from Kaoko portfolio

    Hope and Gorob to make N$1.95b net profit

    Hope and Gorob targets first copper shipment in November

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Mining Diamonds

Rough diamond production in Namibia remained unchanged in first quarter of 2025

by Editor
April 29, 2025
in Diamonds
0
Rough diamond production in Namibia remained unchanged in first quarter of 2025
524
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

There are plans to lower rough diamond production at Debmarine Namibia and offset the output by mining in higher-grade areas and better recoveries at Namdeb.
De Beers says production in Namibia is broadly unchanged for the first quarter of 2025, while in Botswana, production decreased by 8% to 4.6 million carats due to the planned actions to lower production.
In South Africa, production decreased by 19% to 0.5 million carats due to changes in shift configuration and the impact of the heavy rainfall and flooding in January 2025, which temporarily restricted access to the mining operations.
Production in Canada decreased by 40% to 0.4 million carats due to the planned treatment of lower-grade ore.
Overall, rough diamond production decreased by 11% to 6.1 million carats, reflecting the continued production response to the prolonged period of lower demand.
Consumer demand for diamond jewellery in the United States over the year-end holiday season aligned with expectations.
However, rough diamond demand in the first quarter remained subdued as the midstream continued its cautious approach to restocking due to excess loose polished diamond inventory.
While there were signs of loose polished diamond prices stabilising towards the end of the quarter, lifting industry confidence, ongoing macroeconomic uncertainty, and, in particular, the impact of US tariffs, will likely result in continued cautious Sightholder purchases in the near term.
“We continue to manage the business to preserve cash while maintaining underlying value,” De Beers says.
Production guidance 2025 is unchanged at 20–23 million carats (100% basis).

Share210Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Serval confirms copper mineralisation in Namibia’s Kaoko Basin

Serval confirms 37.8% copper and 573g/t silver at Kaoko Basin

October 9, 2026
Koryx hits 969m at 0.27% copper equivalent at Haib

Haib lifts processing capacity to 48Mtpa as Koryx targets November PFS

October 8, 2026
Forsys’ Norasa in the making

Asarian approves 4,500m Namibplaas drilling programme to upgrade 41.1Mlb uranium resource

October 8, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In