• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, May 1, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Lepidico still hopes to find partner for Karibib in first half of 2025

by Editor
November 21, 2024
in News
0
Karibib Lithium Project site works to start in May, mining expected early 2025
543
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Lepidico revised its strategy for the integrated Karibib Lithium Mica project phase I after a prospective partner’s battery supply chain development plans in Europe were undermined.

Although the Lepidico chairperson did not reveal the partner’s name, Gary Johnson said this led the company to pivot its approach to a lower-risk staged implementation.

Lepidico will now prioritise the development of Karibib lepidolite concentrate ahead of the downstream chemical plant.

Karibib is a brownfield redevelopment of Rubicon and Helikon mines with an ore reserve of 9.4 Mt at 0.43% Li2O, 278 ppm Cs, 2.00% K, and 0.21% Rb.

Phase 1 is a vertical integration that will reap the entire value chain benefits—from ore mining to fine chemical manufacture—via our proprietary hydrometallurgical technologies, including L‑Max® and LOH‑Max®.

Ore will be transported to run-of-mine crusher stockpiles, with various grades of ore requiring individual inventories.

The rehandling of ore from stockpiles is needed to balance the feed grade to the concentrator.

A fleet of one 50-ton excavator and four 35-ton trucks can adequately support the mining schedule for the first half of the mine life.

Lepidolite concentrate will be shipped from Namibia to a chemical conversion plant at the KEZAD industrial park in Abu Dhabi.

The conversion plant has a concentrated capacity of 6.9 tph (tons per hour), producing up to 5,700 tpa of lithium hydroxide.

Phase 1 output is estimated at between 4,000 tons and 5,000 tpa of nominal battery-grade lithium product, along with a suite of high-value and bulk by-products, with no solid process waste, making Phase 1 a highly sustainable operation.

Johnson said Lepidico has engaged Jefferies International Ltd. under a new advisory agreement to secure a partner for Karibib rather than the previous vertically integrated project model.

“This process is ongoing, with the current timeline envisaging the deal to close in the first half of calendar 2025,” he said.

Johnson added that Lepidico is now well advanced in securing an institutional investment for bridge finance to provide the working capital needed for Jefferies to conclude its mandate.

Share217Tweet136
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

April 30, 2026
Northern Graphite plans restarting Okanjande in 2027

Okanjande moves closer to restart after Northern clears US$22m debt burden

April 30, 2026
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In