• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, September 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Deep Yellow upgrades Tumas 1, 1 East and 3 mineral resource estimate to 118.2 Mlb

by Editor
September 11, 2024
in Uranium
0
Deep Yellow schedules an ore reserve upgrade drilling program at Tumas 3
526
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Deep Yellow has upgraded the Tumas 1, 1 East, 2, and 3 mineral resource to 118.2 Mlb at 255 ppm eU3O8.
This comprises indicated mineral resources of 102.1 Mlb grading 268 ppm and an inferred mineral resource of 16.1 Mlb at 196 ppm eU3O8 at a 100 ppm eU3O8 cut-off grade.
Deep Yellow’s subsidiary, Reptile Uranium Namibia, holds the deposit under license 237 in the Namib Desert.
The company is confident that the reserve update will extend Tumas’s operating life to over 35 years.
Deep Yellow said the detailed engineering for the currently underway project will provide a control capital estimate and detailed execution schedule.
The updated Tumas 3 mineral resource estimate has a measured and indicated mineral resource totalling 58.2 Mlb at 320 ppm eU3O8 at a 100-ppm cut-off.
Deep Yellow has also upgraded the Tumas 1, 2, and 3 measured mineral resource to 38.5 Mlb at 253 ppm eU3O8.
The remaining indicated mineral resources include 63.6 Mlb at 278 ppm eU3O8.
The new total measured and indicated mineral resources of Tumas 1, 1 East, 2, and 3 is 102.1 Mlb at 268 ppm eU3O8.
The mineral resource estimate upgrade follows the 660-hole, 12,727-m reverse circulation resource infill drill program completed in June 2024.
Deep Yellow said the ongoing resource drilling is planned west of Tumas 3 during FY2025, focusing on identifying an additional 30 Mlb to achieve a +35-year life-of-mine.
According to Deep Yellow, a reserve update based on the new mineral resource is currently underway.
Deep Yellow managing director John Borshoff said Tumas is a standout, tier-1, long-life project.
“The team continues to tick all the boxes as we progress with project financing and marketing ahead of a final investment decision later this year.
“Delivery of the Tumas mineral resource upgrade across the areas earmarked for the initial six years of mining highlights the potential of the mineralised system identified at Tumas to deliver quality uranium resources,” Borshoff added.
He said that even with the detailed infill drilling on the Tumas 3 deposit to convert resources from the indicated to the more stringent measured category, the quantity and quality of the Tumas 3 resource have remained well within the acceptable range.

Share210Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Karibib Lithium Project site works to start in May, mining expected early 2025

Karibib lithium project’s long run of bad luck

September 19, 2026
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
Sultan Resources allocates N$13.3m to kickstart Namibia’s Damara Gold Project

Sultan applies for an additional 171 km² copper-gold ground in Kalkfeld

September 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In