• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, September 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Hirabeb Uranium Prospect within Koppies Project returns high-grade uranium results

by Editor
August 27, 2024
in Uranium
0
Hirabeb Uranium Prospect within Koppies Project returns high-grade uranium results
524
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium says drilling at the mineralised areas at Hirabeb Prospect, within the greater Koppies Uranium Project, has returned high-grade uranium results.
The Hirabeb Uranium Prospect is the second of the company’s four discoveries in four years. Koppies was the first and is more advanced.
The Hirabeb tenement is extensive, with an area of 545 km2, extending 38 km east to west and 18 km north to south.
The most recent program was focused on the 4.5 km long mineralised zone in the south-central part of the tenement, with 60 holes for 1,334 m drilled since the last announcement on July 25, 2024.
Standout intersections include 6.0 m at 797 ppm eU3O8 from 4.5 m, including 2.0 m at 1,482 ppm eU3O8 and 6.5 m at 584 ppm eU3O8 from 8.5 m, including 1.5 m at 1,040 ppm eU3O8.
In addition, interpretation of results from exploration drilling completed earlier this calendar year has identified four new exploration target areas warranting further investigation.
The company says Hirabeb demonstrates a shallow mineralisation style with all significant intercepts commencing within 10 meters of the surface, similar to the Koppies resource.
The geological team has reviewed the data and identified four new target areas to follow up on, all with sparse drilling.
The nearest drill line or tenement boundary varies from three to eight kilometers away, providing large areas for the potential expansion of the mineralisation.
The boundary of the Hirabeb tenement is less than 12 kilometres from the tenement boundary of the Koppies resource and will become a satellite project to feed into any future operation centred on the current Koppies resource.
Elevate Uranium managing director Murray Hill said the Hirabeb Prospect continues to expand, with recent drilling confirming extensions to the mineralised zone over a large area.
Hill added that the results are impressive, displaying a suitable thickness of mineralisation with some excellent grades over 1,000 ppm eU3O8.
“In addition, an ongoing geological review of results has identified four new target areas warranting follow-up.
“This is very encouraging, given that the Hirabeb tenement boundary is less than 12 kilometres from the tenement boundary of the Koppies resource and could potentially become a satellite to the existing Koppies resource,” he said.
“This is exciting as it indicates the opportunity to grow the mineralised areas,” Hill said.
Drilling at Hirabeb will continue for the rest of the calendar year as the company works towards defining and estimating a maiden resource.

Share210Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Karibib Lithium Project site works to start in May, mining expected early 2025

Karibib lithium project’s long run of bad luck

September 19, 2026
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
Sultan Resources allocates N$13.3m to kickstart Namibia’s Damara Gold Project

Sultan applies for an additional 171 km² copper-gold ground in Kalkfeld

September 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In