• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, May 28, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Alfred H. Knight celebrates 10 years of supporting Namibia’s mining, agriculture sectors

    Alfred H. Knight celebrates 10 years of supporting Namibia’s mining, agriculture sectors

    Koryx strengthens Haib technical team, plans bringing additional drill rigs ahead of updated technical report

    Koryx strengthens Haib technical team, plans bringing additional drill rigs ahead of updated technical report

    Midas Minerals acquires Otavi South Copper Project, extends footprint in Namibia

    Midas Mineral seeks US$6.5m for acquiring and exploring Otavi copper projects

    Askari Metals plans rock chip, license-wide soil geochemical sampling campaign for Uis Lithium Project

    Askari Metals plans rock chip, license-wide soil geochemical sampling campaign for Uis Lithium Project

    Marine site investigator GEOxyz sets first African shop in Namibia

    Marine site investigator GEOxyz sets first African shop in Namibia

    Connected Minerals Limited to explore three zones at its Etango North-East uranium project

    Connected Minerals report strong potential economic uranium grades at Etango North-East Project

    Gratomic Inc hit by executive exodus

    Gratomic Inc hit by executive exodus

    Super Nova Corp increases WestOil stake by 36% for N$32m to become Block 2712A operator

    Super Nova Corp increases WestOil stake by 36% for N$32m to become Block 2712A operator

    Midas Minerals acquires Otavi South Copper Project, extends footprint in Namibia

    Midas Minerals acquires Otavi South Copper Project, extends footprint in Namibia

    Geo Exploration upgrades PEL 94 in Walvis Basin gross mean prospective resource to 4.31 billion barrels

    Geo Exploration upgrades PEL 94 in Walvis Basin gross mean prospective resource to 4.31 billion barrels

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Koryx Copper team at the Haib copper project reviews technical studies to assess milling options

by Editor
August 9, 2024
in Copper
0
Koryx Copper raises N$21m to explore the Haib Copper Project and Zambian assets
505
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

The Koryx Copper team at the Haib project is reviewing historical technical studies to assess the potential viability of a conventional milling & flotation circuit.
Haib is a large and advanced copper/molybdenum porphyry deposit in southern Namibia with multiple operators’ histories of exploration and project development.
The team wants to compare the currently envisaged flotation of fine material with bacterial leaching of the coarse material.
This week, Koryx Copper intersected 72 meters at 0.38% and 80 meters at 0.34% copper equivalent, extending the mineralisation limits at the Haib Copper Project.
A new drill program is planned to identify all remaining mineralised zones and their controls within the main Haib area while reducing the drill spacing to convert resources to the indicated levels in the Target 1, Target 2, and Target 3 areas.
Drill planning is far advanced, and the fieldwork program is expected to start in August 2024.
A follow-on metallurgical test work program has been designed, including crushing, milling, flotation testwork for higher-grade material, coarse particle flotation, and bacterial heap leaching of lower-grade samples.
In conjunction with the new metallurgical program, the team is defining additional scopes of work that need to be completed before further feasibility studies can commence.
Trade-off studies will focus on value chain optimisation and mine planning for the updated mineral resource estimate (MRE) when available.
More than 70,000 meters of drilling have been conducted at Haib since the 1970s, and significant exploration programs have been led by companies such as Falconbridge (1964), Rio Tinto (1975), and Teck (2014).
Teck remains a strategic and supportive shareholder.
In addition to extensive drilling, metallurgical testing, geophysics, and geological mapping, various mine modelling and technical studies have been completed.
Koryx Copper CEO Pierre Léveillé said the final results from our 2024 drill program demonstrate that the deposit can deliver grades over 0.3% Cu for substantial widths within the project area.
Léveillé also said the results indicate the potential to significantly improve the average grade of the deposit compared to previous mineral resource estimates.
“These results are also important in that they also indicate above-average grades in the outer limits of the deposit. This bodes well for the imminent, updated NI 43-101 Mineral Resource Estimate and follow-up drill program due to start in August 2024.”

Share202Tweet126
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Puranium Energy’s arrested development on its 5 uranium EPLs set on 81.955ha

Puranium Energy’s arrested development on its 5 uranium EPLs set on 81.955ha

May 28, 2025
Alfred H. Knight celebrates 10 years of supporting Namibia’s mining, agriculture sectors

Alfred H. Knight celebrates 10 years of supporting Namibia’s mining, agriculture sectors

May 28, 2025
Koryx strengthens Haib technical team, plans bringing additional drill rigs ahead of updated technical report

Koryx strengthens Haib technical team, plans bringing additional drill rigs ahead of updated technical report

May 27, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe