• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, June 7, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    China National Nuclear Corporation cleared to partner with Bannerman in Etango Uranium Project

    China National Nuclear Corporation cleared to partner with Bannerman in Etango Uranium Project

    British Virgin Island-registered Chinese company acquires Okorusu Fluorspar

    British Virgin Island-registered Chinese company acquires Okorusu Fluorspar

    London-listed Arkle buys Namibia uranium stake for N$49m

    Arkle brings in London mining broker as Namibia uranium push gathers pace

    bp to launch large-scale 3-D seismic survey in Walvis Basin before end of 2026

    bp to launch large-scale 3-D seismic survey in Walvis Basin before end of 2026

    Koryx Copper Resources’ Haib Mine: One of the oldest copper deposits in Africa

    Haib expected to process 40 million tonnes of material after redesign

    Tower Resources bets big on Walvis Basin potential

    Tower Resources raises £1.87m through 2 share subscriptions

    Nasan Energies takes over divested Engen and Shell service stations

    Nasan Energies takes over divested Engen and Shell service stations

    TotalEnergies buys 19,89% combined interest in Impact Oil’s Blocks 2912 and 2913B in Orange Basin

    Impact sheds South African assets to focus on Namibia’s Venus project

    Kaoko Metals launches IPO to fund copper exploration in northern Namibia

    Namibia turning explorers into market winners, says FitzGerald

    Sintana raises US$11.5m for Namibia offshore drilling campaign

    Sintana raises US$11.5m for Namibia offshore drilling campaign

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Zinc

Appian Capital Advisory to complete Rosh Pinah zinc mine expansion by July 2026

by Editor
January 9, 2025
in Zinc
0
Appian Capital Advisory to complete Rosh Pinah zinc mine expansion by July 2026
637
SHARES
1.8k
VIEWS
Share on FacebookShare on Twitter

Head of Base Metals at Appian Capital Advisory, Ignacio Bustamante, told Fastmarkets that the Rosh Pinah zinc mine wants to double production by 2026.
Appian Capital Advisory acquired Trevali Mining Corporation’s 89.96% interest in the Rosh Pinah zinc mine in June 2023.
When Appian Capital Advisory acquired the majority stake, Rosh Pinah was producing 2,000 tons per day.
The company announced then that it would restart the Rosh Pinah 2.0 mine expansion project, which would nearly double the annual ore throughput to 1.3 million tons and improve safety and environmental performance.
The Rosh Pinah 2.0 expansion project envisages the construction of new processing facilities, including adding a paste fill and water treatment plant, a dedicated portal, and declining to extend deposits.
The project will increase mill throughput from 0.7 million tonnes to 1.3 million tonnes of ore per annum, on average, increasing zinc equivalent production to 170 million pounds per annum.
Bustamante confirmed that the Rosh Pinah 2.0 expansion is due for completion by July 2026.
According to Bustamante, plenty of opportunities have been identified, and they have already started working on the mining side, the metallurgical side, and the Rosh Pinah 2.0 expansion.
“We have completed most of the engineering work for the key components, and we have already placed orders and secured production for key components such as the crushing system, filters, semi-autogenous mill (SAG) mill, and flotation cells. Everything is in good shape,” Bustamante said.
He added that they believe the first milestone will be when the paste backfill plant becomes operational, which should be sometime around [the third quarter of] 2025.

Share255Tweet159
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
China National Nuclear Corporation cleared to partner with Bannerman in Etango Uranium Project

China National Nuclear Corporation cleared to partner with Bannerman in Etango Uranium Project

June 5, 2026
Omitiomire Copper project changes hands as Appian secures approval

Omitiomire Copper project changes hands as Appian secures approval

June 5, 2026
British Virgin Island-registered Chinese company acquires Okorusu Fluorspar

British Virgin Island-registered Chinese company acquires Okorusu Fluorspar

June 5, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In