• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, September 19, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Unicorn targets Klein Aub copper production within 12 months

    Unicorn targets Klein Aub copper production within 12 months

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Mining Diamonds

Rough diamond production in Namibia down by 4% to 566,000 carats

by Editor
February 8, 2024
in Diamonds
0
Rough diamond production in Namibia down by 4% to 566,000 carats
585
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

De Beers says rough diamond production in Namibia decreased by 4% to 566,000 carats in the fourth quarter of 2023 due to marginally lower grades at the land operations.
In the fourth quarter of 2022, Namibian operations produced 590 000 carats
Overall, the company saw a 3% decrease to 7,9 million carats due to a planned reduction in South Africa as Venetia transitions to underground operations.
Venetia will continue to process lower-grade surface stockpiles as the underground operations ramp up production over the next few years.
De Beers recorded a 54% decrease to 0.4 million carats in South Africa, while production in Canada decreased by 3% to 0.8 million carats because of the planned treatment of lower-grade ore.
The only increase of 6% to 6.1 million carats came from Botswana owing to increased plant throughput at the Orapa mine.
De Beers offered full flexibility for rough diamond allocations in Sights 9 and 10, as Sightholders continued to take a cautious approach to their purchasing during the quarter as a result of the prevailing market conditions and extended cutting and polishing factory closures in India; this followed a two-month voluntary import moratorium on rough diamonds into India during the period.
Consequently, rough diamond sales totalled 2.7 million carats from two Sights, compared with 7.3 million from two Sights in the fourth quarter of 2022 and 7.4 million from three Sights in the third quarter of 2023.
The full-year consolidated average realised price decreased by 25% to $147/ct, reflecting a larger proportion of lower-value rough diamonds sold and a 6% decrease in the average rough price index.
Production guidance for 2024 is unchanged at 29-32 million carats (100% basis). However, De Beers will assess options to reduce production in response to prevailing market conditions.
Unit cost guidance for 2024 is c.$80/carat.

 

Share234Tweet146
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
Sultan Resources allocates N$13.3m to kickstart Namibia’s Damara Gold Project

Sultan applies for an additional 171 km² copper-gold ground in Kalkfeld

September 18, 2026
Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

September 17, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In