• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, August 10, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Union warns workers risk being left behind as mining changes

    Union warns workers risk being left behind as mining changes

    Midas takes 6 months from acquisition to drilling

    Midas hits 35.6m at 3.35% copper at Deblin near Otavi

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Appian makes Namibia its biggest global mining investment destination

    Namibia must develop more investment-ready mining projects, says Appian

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Botshiwe urges faster reforms to unlock mining investment

    ECC delays holding back mining investment, Chamber warns

    Government should let business do business, says Swakop Uranium

    Government should let business do business, says Swakop Uranium

    1, 500 working on site at Osino’s Twin Hills ahead of first gold next year

    1, 500 working on site at Osino’s Twin Hills ahead of first gold next year

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Water levels at Kombat mine shafts lowered to 238m ahead of underground mining in Q2

by Editor
January 24, 2024
in Copper
1
The story of Kombat Mine: Flooded three times but rose to still provide copper
606
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

Trigon Metals CEO Jed Richardson says the dewatering programme at Kombat copper mine has progressed well in the past weeks.
Richardson says the water level has been lowered 238m, past the 7th level and beyond the company’s sixth-level goal necessary to start underground mining.
According to Richardson, Trigon remains on track to initiate underground mining beginning in Q2 this year.
“As we prepare for this stage, Trigon Metals anticipates increased operational efficiency and enhanced resource extraction following the promising drill results that have showcased the substantial mineralisation within the targeted zones,” he says.
In a statement Tuesday, Triagon said the drilling results from the shallow areas of Asis West Shaft close to the historic Omega Shaft from a century ago yielded high-grade zones of copper mineralisation to be accessed from underground.
Meanwhile, Trigon’s vice president of exploration, Andy Rompel, said the findings further demonstrate the high-grade copper and silver potential within the company’s licences and solidify confidence in the exploration and development potential of the Kombat project.

Share242Tweet152
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Union warns workers risk being left behind as mining changes

Union warns workers risk being left behind as mining changes

August 10, 2026
Wia grows Kokoseb gold resource 29% to 3.78Moz

Wia grows Kokoseb gold resource 29% to 3.78Moz

August 10, 2026
Wia unveils 1.95Moz Kokoseb reserve for US$475m mine with US$1.2bn NPV

Wia unveils 1.95Moz Kokoseb reserve for US$475m mine with US$1.2bn NPV

August 10, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In