• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, April 19, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

    Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Noronex starts spectrometry survey at Etango North Uranium Project for follow-up exploration

    Noronex drills Etango North, builds A$2m war chest as uranium, copper push intensifies

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy completes PEL 93 survey, targets well identification as Kavango testing unfolds

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    ReconAfrica starts civil works ahead of drilling Naingopo well in the Kavango Basin

    ReconAfrica targets June completion for Kavango well testing

    When it comes to uranium, Namib Desert does not disappoint

    Elevate grows Koppies uranium resource from 66.1Mlb to 76.2Mlb after Namib IV discovery

    Galp and partners find ‘significant column of light oil’ on Mopane-2X in the Orange Basin

    Sintana moves to list on NSX, opens offshore oil play to Namibians

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

B2Gold budgets US$9m for Otjikoto 2024 exploration focusing on Antelope deposit discovery

by Editor
January 24, 2024
in Gold
0
Wolfhag rescues Otjikoto Gold Mine once again
671
SHARES
1.9k
VIEWS
Share on FacebookShare on Twitter

B2Gold has budgeted US$9m for an exploration program at Otjikoto in 2024, targeting gold production of between 180,000 and 200,000 ounces in 2025.
Otjikoto Mine, where the company holds a 90% interest, produced 81,111 ounces of gold in the fourth quarter of 2023, a quarterly record, with production from the Wolfshag underground mine remaining consistent.
For 2023, the Otjikoto Mine produced 208,598 ounces of gold, near the upper end of its guidance range of 190,000 to 210,000 ounces.
For 2024, B2Gold wants to explore the recently discovered Antelope deposit, located approximately three km south of Phase 5 of the Otjikoto open pit.
The drilling campaign, the largest program since the definition of the Wolfshag discovery in 2012, targets 39,000m.
The company expects to mine ore from Phase 5 of the open pit, and the Wolfshag underground mine, with mill throughput, gold grade processed, and gold recoveries all expected to be similar to 2024 levels.
Otjikoto is expected to process 3.4 million tonnes of ore at an average grade of 1.77 g/t gold and a process gold recovery of 98.0%.
Processed ore will be sourced from the Otjikoto pit and the Wolfshag underground mine, supplemented by existing medium and high-grade ore stockpiles.
Open-pit mining operations are scheduled to ramp down throughout 2024 and conclude in 2025, while underground mining operations at Wolfshag will continue through 2026.
Exploration results indicate the potential to extend underground production at Wolfshag past 2026, supplementing the processing operations, which will continue until 2031, when economically viable stockpiles are forecast to be exhausted.
B2Gold says the capital expenditures at Otjikoto in 2024 are expected to total US$33 million, of which approximately US$32 million is classified as sustaining capital expenditures and US$1 million is classified as growth capital expenditures.
Sustaining capital expenditures are anticipated to include US$32 million for capitalized stripping and deferred underground development.

Share268Tweet168
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
NJ Ayuk urges IOCs to invest in Namibia

NJ Ayuk urges IOCs to invest in Namibia

April 19, 2026
Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

April 17, 2026
Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

April 17, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In