• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, August 26, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Koryx hits 969m at 0.27% copper equivalent at Haib

    Koryx hits 969m at 0.27% copper equivalent at Haib

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Langer Heinrich uranium revenue jumps 71% to US$304m

    Langer Heinrich uranium revenue jumps 71% to US$304m

    Andrada confirms lithium grades of up to 3.46% at Lithium Ridge

    Andrada hits 24 metres at 2% lithium at Lithium Ridge

    John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

    Forsys becomes Asarian Energy on NSX from Wednesday

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

    Tower waits on minister’s signature to unlock PEL 96 farm-out payment

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    First oil cannot be Namibia’s destination – Shilunga

    First oil cannot be Namibia’s destination – Shilunga

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

B2Gold budgets US$9m for Otjikoto 2024 exploration focusing on Antelope deposit discovery

by Editor
January 24, 2024
in Gold
0
Wolfhag rescues Otjikoto Gold Mine once again
678
SHARES
1.9k
VIEWS
Share on FacebookShare on Twitter

B2Gold has budgeted US$9m for an exploration program at Otjikoto in 2024, targeting gold production of between 180,000 and 200,000 ounces in 2025.
Otjikoto Mine, where the company holds a 90% interest, produced 81,111 ounces of gold in the fourth quarter of 2023, a quarterly record, with production from the Wolfshag underground mine remaining consistent.
For 2023, the Otjikoto Mine produced 208,598 ounces of gold, near the upper end of its guidance range of 190,000 to 210,000 ounces.
For 2024, B2Gold wants to explore the recently discovered Antelope deposit, located approximately three km south of Phase 5 of the Otjikoto open pit.
The drilling campaign, the largest program since the definition of the Wolfshag discovery in 2012, targets 39,000m.
The company expects to mine ore from Phase 5 of the open pit, and the Wolfshag underground mine, with mill throughput, gold grade processed, and gold recoveries all expected to be similar to 2024 levels.
Otjikoto is expected to process 3.4 million tonnes of ore at an average grade of 1.77 g/t gold and a process gold recovery of 98.0%.
Processed ore will be sourced from the Otjikoto pit and the Wolfshag underground mine, supplemented by existing medium and high-grade ore stockpiles.
Open-pit mining operations are scheduled to ramp down throughout 2024 and conclude in 2025, while underground mining operations at Wolfshag will continue through 2026.
Exploration results indicate the potential to extend underground production at Wolfshag past 2026, supplementing the processing operations, which will continue until 2031, when economically viable stockpiles are forecast to be exhausted.
B2Gold says the capital expenditures at Otjikoto in 2024 are expected to total US$33 million, of which approximately US$32 million is classified as sustaining capital expenditures and US$1 million is classified as growth capital expenditures.
Sustaining capital expenditures are anticipated to include US$32 million for capitalized stripping and deferred underground development.

Share271Tweet170
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Koryx hits 969m at 0.27% copper equivalent at Haib

Koryx hits 969m at 0.27% copper equivalent at Haib

August 26, 2026
Deep Yellow locks in water, local ownership ahead of Tumas investment decision

Deep Yellow locks in water, local ownership ahead of Tumas investment decision

August 26, 2026
Langer Heinrich uranium revenue jumps 71% to US$304m

Langer Heinrich uranium revenue jumps 71% to US$304m

August 26, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In