• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, May 19, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

    Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

    Navachab welcomes 28 apprentices

    Navachab welcomes 28 apprentices

    Snow Lake Energy targets end of 2025 for Engo Valley Uranium Project’s maiden mineral resource estimate

    Engo Valley uranium project maiden resource set for mid-third quarter 2026

    Trigon’s smart exit – walks away with about US$25m net gain and a debt-free future

    New Horizon revives dewatering strategy at Kombat Copper

    Koryx Copper to raise N$26.6m from selling 16 million shares

    Koryx reports 150m at 0.45% CuEq, targets 92,000t annual copper output at Haib

    Omitiomire – Namibia’s next copper mine

    Appian Capital Advisory acquires 95% stake in Omitiomire Copper Project

    Langer Heinrich Mine hits 3 million pounds output as final ramp-up phase begins

    Langer Heinrich increases production to 1.29 million pounds in last quarter

    ReconAfrica might need more money for Kavango West drilling

    ReconAfrica targets May start for Kavango West 1X production testing

    EU backs Namibia’s push for mineral value addition and green industrialisation

    EU backs Namibia’s push for mineral value addition and green industrialisation

    EU takes N$17.6b of Namibia’s exports in 2025 with uranium, gold anchoring trade flows

    EU takes N$17.6b of Namibia’s exports in 2025 with uranium, gold anchoring trade flows

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Lithium

Kaoko Lithium Project test drilling set for 2024

by Editor
November 13, 2023
in Lithium
0
Kaoko Lithium Project test drilling set for 2024
536
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Cazaly Resources wants to start a drilling programme at its Kaoko Lithium Project either late in the first quarter or early in the second quarter of 2024.

The Perth-based company is developing the Abenab North Rare Earth Elements and Base Metals Project and the Kaoko Critical Minerals Project under which Kaoko Lithium Project falls.

Cazaly owns a 95% interest in the Kaoko Project, under EPL6667, initially granted in February 2018 and renewed until February 2023. 

The Kaoko Project, only 50km from Opuwo town, is about 100km long and covers 1410 km2.

In a statement on Monday, Cazaly says it wants to test a 12km-long lithium in soil anomaly using reverse circulation.

According to the statement, Cazaly targets completing about 3,000m of drilling following approvals of vegetation clearing and drilling permits. 

“This initial drilling phase will test the regolith and fresh rock beneath the highest lithium in soil results on a 200m x 100m grid,” Cazaly says. 

Cazaly’s managing director, Tara French, said the drill program is designed to test the lithium anomaly in fresh rock to develop a better understanding of the distribution of lithium within the stratigraphic units at Ohevenga and the nature of this potentially unique sediment-hosted lithium anomaly.

Share214Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

May 19, 2026
Navachab welcomes 28 apprentices

Navachab welcomes 28 apprentices

May 18, 2026
Hebei Construction takes Kazera Global to high court over US$11.9m tantalum mine dispute

Kazera flags growing interest in Namibia’s Aftan tantalum-lithium project

May 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In