• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, October 29, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Reviving the Moosehead in PEL 87

    Pancontinental’s Namibia oil drilling plans hinge on finding a partner

    Connected Minerals starts Phase 2 drilling at Etango North-East’s Ondapanda prospect

    Connected Minerals puts two Namibian uranium projects on hold

    Kaoko Metals expands Namibia copper exploration to three drilling rigs

    Kaoko Metals expands Namibia copper exploration to three drilling rigs

    Six Namibian contractors involved in Etango’s US$353m uranium mine construction

    Six Namibian contractors involved in Etango’s US$353m uranium mine construction

    China secures 60% of Etango uranium production

    China secures 60% of Etango uranium production

    Botswana’s Motheo copper mine produces 13,341 tonnes in three months

    Botswana’s Motheo copper mine produces 13,341 tonnes in three months

    Otavi REE assets drive Cazaly’s recent trading level of A$0.032

    Cazaly identifies two copper drilling targets at Abenab North

    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow spends N$85m on Tumas uranium project in three months

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow moves closer to Nedbank credit approvals for Tumas uranium mine

    Woodside Energy opts out of PEL 87 farm-in deal before stop date of May 18, 2025

    Pancontinental proposes drilling first well at Namibia’s PEL 87 within two years

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Energy

Cleanergy Solutions Namibia receives first hydrogen equipment

by admin
October 27, 2023
in Energy, Green Hydrogen, Namibia, News
0
Cleanergy Solutions Namibia receives first hydrogen equipment
520
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Cleanergy Solutions Namibia has received the first piece of hydrogen equipment – a 40-bar low-pressure buffer tank.

The company, a joint venture between Ohlthaver & List (O&L) and CMB.TECH, is developing the green hydrogen production plant located at Walvis Bay.

The equipment will play a key role in ensuring seamless operations between the electrolyser and compressors, marking a significant step forward in our pursuit of sustainable hydrogen production.

The project includes a 10-hectare solar park with a hydrogen production facility equipped with a 5-megawatt Proton Exchange Membrane electrolyser and a 5-megawatt hour battery.

Cleanergy Solutions Namibia started the bricklaying process of Africa’s first public green hydrogen refuelling station on 23 September 2023.

The company wants the hydrogen refuelling station to be fully operational by mid-2024.

The facility will supply hydrogen to trucks, port equipment, and railway applications.

The hydrogen production plant established in Walvis Bay, Namibia, uses solar energy for hydrogen production onsite.

Cleanergy Solutions Namibia will also establish a Hydrogen Academy to educate and train local individuals on hydrogen technology and its wide-ranging applications.

Share208Tweet130
admin

admin

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Reviving the Moosehead in PEL 87

Pancontinental’s Namibia oil drilling plans hinge on finding a partner

October 29, 2026
Connected Minerals starts Phase 2 drilling at Etango North-East’s Ondapanda prospect

Connected Minerals puts two Namibian uranium projects on hold

October 29, 2026
Kaoko Metals expands Namibia copper exploration to three drilling rigs

Kaoko Metals expands Namibia copper exploration to three drilling rigs

October 29, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe