• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, June 25, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    MUN embarks on nationwide engagement with workers

    MUN embarks on nationwide engagement with workers

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Eco Atlantic says Orange Basin oil discoveries open farm-out opportunities for its Walvis Basin blocks

    Eco Atlantic prepares major offshore exploration campaign across three Walvis Basin licences

    Aune Amutenya appointed acting petroleum commissioner

    Aune Amutenya appointed acting petroleum commissioner

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    African Pioneer seeks to raise £420,000 for Ongombo copper-gold project

    Hong Kong-based Chinese mining group Xinhai to fund Ongombo-Ongeama copper projects

    Former Deep Yellow boss John Borshoff joins Forsys Metals

    Former Deep Yellow boss John Borshoff joins Forsys Metals

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Critical Metals

Askari Metals reports high-grade tin, lithium and tantalum assays at Uis

by Editor
April 24, 2026
in Critical Metals
0
Askari Metals keeps reduced team at Uis project for low-cost but high impact
513
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Askari Metals Limited reports that assays from trenching at its Uis Project in Namibia have returned high-grade tin, lithium and tantalum results, confirming a broad polymetallic system across its licences.

During the March quarter, the company received additional assay results from a trenching programme at EPL 7345, with peak values including 3,360 ppm tin, 1.25% lithium oxide, 364 ppm tantalum, 3,370 ppm rubidium and 587 ppm caesium.

The results come from the DP pegmatite target, where systematic trenching across ten pegmatites on a 40-metre grid has begun to define the scale and continuity of mineralisation.

Askari completed 39 trenches totalling 749 metres, collecting 325 channel samples, with multiple trenches intersecting mineralisation across the full width of the pegmatites.

The main pegmatite has been traced over approximately 700 metres of strike with an average surface thickness of about six metres, supporting the potential for a sizeable mineralised system.

The latest assays build on earlier exploration, including rock chip samples that returned up to 1.92% lithium oxide, and historical results of up to 4.05% tin oxide and 1,121 ppm tantalum from nearby pegmatites.

Previous reverse circulation drilling intersected narrower zones, including 4 metres at 0.16% tin oxide and 4 metres at 314 ppm tantalum, although the company said earlier drilling did not adequately test the main target.

Askari said a technical review of historical data has allowed it to reinterpret the geology and better define the extent of mineralisation across EPL 8535, EPL 7345 and EPL 7626, positioning the project as a polymetallic system hosting tin, tantalum, lithium and rubidium.

The licences are located adjacent to the operating Uis Tin Mine, owned by Andrada Mining Limited, placing the project within an established mining district.

The company is now advancing plans for reverse circulation drilling in the second half of 2026, which will test the continuity of mineralisation at depth, alongside further sampling programmes at EPL 7626.

Share205Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

June 25, 2026
Rössing marks 50 years with N$37m investment in science and digital innovation hub

Rössing marks 50 years with N$37m investment in science and digital innovation hub

June 25, 2026
Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

Tower Resources waits on final Namibia approval as Prime Global farm-out nears completion

June 24, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In