• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, April 21, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

    Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Noronex starts spectrometry survey at Etango North Uranium Project for follow-up exploration

    Noronex drills Etango North, builds A$2m war chest as uranium, copper push intensifies

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy completes PEL 93 survey, targets well identification as Kavango testing unfolds

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    ReconAfrica starts civil works ahead of drilling Naingopo well in the Kavango Basin

    ReconAfrica targets June completion for Kavango well testing

    When it comes to uranium, Namib Desert does not disappoint

    Elevate grows Koppies uranium resource from 66.1Mlb to 76.2Mlb after Namib IV discovery

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Elevate grows Koppies uranium resource from 66.1Mlb to 76.2Mlb after Namib IV discovery

by Editor
April 15, 2026
in Uranium
0
When it comes to uranium, Namib Desert does not disappoint
512
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium has boosted its Koppies Project resource base to 76.2 million pounds of U₃O₈, following a maiden inferred resource of 10.1 million pounds at the Namib IV deposit in Namibia’s Erongo Region.

The new estimate is based on 29.5 million tonnes grading 155 ppm eU₃O₈, marking a significant expansion of the company’s footprint in one of the world’s most established uranium jurisdictions.

Managing director Murray Hill said the result validates the company’s exploration strategy in the region and signals further growth potential.

“The Koppies Uranium Project now has JORC mineral resources of 76.2 Mlb U₃O₈, which the Company expects is likely to continue to grow,” he said.

Hill added that the Namib IV discovery confirms the broader-scale potential of the district, with mineralisation remaining open to the northeast and south, and several untested targets still on the tenement.

The addition of Namib IV lifts Elevate’s total Namibian uranium inventory to 106.4 million pounds, while its global resource base now stands at 163.4 million pounds U₃O₈.

Located within the Namib Naukluft Park, the Koppies Project sits in a prolific uranium corridor hosting around 359 million pounds of U₃O₈ across multiple operators and lies close to established infrastructure and producing mines such as Langer Heinrich.

Geologically, the Namib IV deposit spans a 5 km strike length, with widths ranging from 400 to 800 metres, and mineralisation extending to depths of up to 25 metres.

The resource is dominated by basement-hosted mineralisation, which accounts for about 81% of contained uranium, alongside calcrete-hosted palaeochannel deposits.

Elevate said the deposit remains robust across multiple cut-off grades, supporting confidence in geological continuity and future development potential.

The company is also advancing its proprietary U-pgrade™ beneficiation technology, which has demonstrated the ability to increase ore grade up to 50 times while reducing ore mass by about 95% before processing, potentially lowering capital and operating costs.

With further drilling planned and multiple targets yet to be tested, Elevate is positioning Koppies as a district-scale uranium project in Namibia’s expanding nuclear fuel pipeline.

Share205Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Northern Graphite plans Okanjande mine restart in 2027

Northern Graphite plans Okanjande mine restart in 2027

April 21, 2026
Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

Multi-project oil province forms as FID timelines align for 2026–2027

April 20, 2026
Hardwire oil wealth into law to avoid missed opportunity — McLeod

Hardwire oil wealth into law to avoid missed opportunity — McLeod

April 20, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In