• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, August 25, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

    Forsys becomes Asarian Energy on NSX from Wednesday

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

    Tower waits on minister’s signature to unlock PEL 96 farm-out payment

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    First oil cannot be Namibia’s destination – Shilunga

    First oil cannot be Namibia’s destination – Shilunga

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast identifies first uranium targets across three Erongo licences

    Bannerman targets over 80% Namibian workforce at Etango

    Bannerman targets over 80% Namibian workforce at Etango

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

Hope & Gorob copper-gold resource climbs sevenfold to 3Mt

by Editor
April 9, 2026
in Gold
0
Hope and Gorob to make N$1.95b net profit
560
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Bezant Resources has updated the Hope & Gorob mineral resource estimate from 0.41 million tonnes in 2023 to more than 3.0 million tonnes in 2026, marking a sevenfold increase that is set to accelerate development of the Namibian copper-gold project.

The revised resource, prepared by independent consultants Sound Mining in accordance with the JORC Code (2012), significantly upgrades both the scale and confidence of the deposit, with portions of the resource now classified as Measured and Indicated rather than predominantly Inferred in the earlier estimate.

The update has immediate implications for the project’s development timeline.

Bezant said the increase in open-pittable material allows it to bring forward Phase 2 of the Hope Project by five years, shifting the focus toward expanded processing capacity and higher output.

At the same time, improvements in mining efficiency are expected, with the strip ratio reduced from 11:1 to 9:1, lowering operating costs and enhancing project economics.

The updated estimate extends the life of mine for the open pit operation from just one year under the previous model to approximately 7.5 years, based on a processing rate of 400,000 tonnes per annum through an ore sorting system.

Further upside remains embedded in the project. Bezant has identified an additional 3.6 million tonnes of mineralisation not yet included in the current resource, alongside 1.3 million tonnes of lower-grade material within the pit shell that could be upgraded through on-site processing.

The company also noted that mineralisation occurring outside the current pit shell could potentially extend open pit operations by at least another five years, subject to further drilling.

Executive chairman Colin Bird said the updated resource materially strengthens the project’s outlook.

“This announcement concerning the updated mineable resource has produced a very positive outcome. Reduction in stripping rates amounts to significant cost saving and the increase in open cut mine life is very satisfying,” Bird said.

“All we see at Hope & Gorob, together with the forecast of world copper prices, leads us to accelerate further our ore confirmation activities and plant design for phase 2.”

Phase 2 development is expected to include the construction of a flotation plant, likely located closer to Walvis Bay, with projected annual production of 25,000 tonnes of copper and potential annual revenue of about US$290 million at a copper price of US$11,500 per tonne.

The Hope and Gorob project is located approximately 100 kilometres southeast of Walvis Bay and 215 kilometres southwest of Windhoek, within the Naukluft area of the Erongo Region.

It operates under Mining Licence 246, granted in April 2025 for a 15-year period to Hope and Gorob Mining (Pty) Ltd, in which Bezant currently holds a 70% interest, set to increase to 90% following a recent acquisition.

Geologically, the deposit sits within the Matchless Amphibolite Belt, a 350-kilometre-long structure known for hosting volcanogenic massive sulphide-style mineralisation, a setting associated with copper-rich deposits across Namibia.

With upgraded resources, improved economics, and an accelerated development timeline, Bezant is now positioning the Hope & Gorob project as a near-term producer, with production targeted to begin this year using an upgraded existing plant and a phased ramp-up strategy.

Share224Tweet140
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
OPINION: Before Kokoseb Is Approved, Namibia Must Answer One Question: What Happens to the People in Its Path?

OPINION: Before Kokoseb Is Approved, Namibia Must Answer One Question: What Happens to the People in Its Path?

August 25, 2026
John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

Forsys becomes Asarian Energy on NSX from Wednesday

August 25, 2026
ReconAfrica targets October for 1,000m horizontal test at Kavango West

ReconAfrica targets October for 1,000m horizontal test at Kavango West

August 25, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In