• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, May 10, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Okanjande graphite to be upgraded into Battery Anode Material in a N$3b facility in France

    Northern Graphite begins relocating plant for Okanjande restart late 2027

    Kaoko Metals lists with $6.5m raise, targets high-grade Chalkos Copper-Silver Project

    Kaoko Metals lists with $6.5m raise, targets high-grade Chalkos Copper-Silver Project

    Shaanika takes over as Chamber CEO as Malango retires after 20 years

    Shaanika takes over as Chamber CEO as Malango retires after 20 years

    General Copper targets 80% stake in Otjozondjupa 48,500ha licence

    General Copper targets 80% stake in Otjozondjupa 48,500ha licence

    Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

    Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

    Mining exports hit N$64.7bn as Namibia shifts focus to energy, oil and gas — Nandi-Ndaitwah

    Namibia says 51% free-carry mine ownership not policy

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas hits 50m at 7.9% CuEq in highest-grade Otavi intercept yet

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Bannerman eyes Etango FID within the next six to nine months, targets 750 full time jobs

by Editor
February 23, 2026
in Uranium
0
Bannerman eyes Etango FID within the next six to nine months, targets 750 full time jobs

xr:d:DAFf8Y03J_8:59,j:2926899190,t:23041806

551
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Bannerman Energy says it expects to take a final investment decision (FID) on its Etango uranium project in the second half of this year, likely in August or November 2026, subject to the completion of conditions precedent and regulatory approvals.

The company struck a binding strategic financing and joint venture agreement with CNNC Overseas Limited (CNOL), a subsidiary of the China National Nuclear Corporation (CNNC), for the development of the Etango uranium project in Namibia.

Under the deal, CNOL will invest up to US$321.5 million (about N$5.1 billion) into a newly formed joint venture (JVCo), acquiring a 45% stake in the entity that owns 95% of the Etango project.

Of this total, the initial subscription is US$294.5 million in cash, with up to an additional US$27 million in reimbursements to Bannerman for past agreed project expenditure.

The agreement includes a life-of-mine offtake entitlement for 60% of Etango’s production on market-based terms, with Bannerman free to market the remaining 40%.

Bannerman chief executive Gavin Chamberlain told the media in Windhoek on Monday that the funding arrangement still has “probably six to nine months to run before it’s finalised”, with a final signed contract expected once the conditions precedent have been met.

“Once the conditions precedent have been met, we will have a final signed contract and at that point in time we will do the FID,” Chamberlain said.

He said the deal structure enables Bannerman to keep the project on its current schedule despite the outstanding approvals, with commissioning targeted for 2028 and uranium expected to reach the market in 2029.

“The good news about the contract is it’s going to allow me to continue to develop in this period while we’re doing the CPs, to actually continue to develop the project along the current timelines,” Chamberlain said.

Chamberlain said the transaction is structured as a 55%–45% split, with the partner contributing its 45% share of costs during the period in which conditions precedent are being completed.

“Even though we haven’t finalised the agreement, it allows us to continue with development until we get to FID,” he said.

Competition commission approval

Chamberlain said the main Namibian conditions precedent include finalising a water supply contract and amending a Namport lease agreement for a port-side facility, alongside approval from the Namibian Competition Commission.

“We have to finalise the water supply contract and we have to finalise the lease agreement that we have of Namport for the asset facility in the port,” he said.

He added that Bannerman already has a lease in place, but wants amendments that are “currently sitting with Namport”.

Chamberlain said the Competition Commission process has started and argued that the deal should have a limited local competition impact because it was concluded at the UK level.

He said the funding structure supports a build-through to production, with employment projected to rise from about 450 Namibians currently on site to as many as 1,200 during construction, before settling at roughly 750 full-time jobs in operations.

Part of the broader agreement involves selling 60% of Etango’s uranium output to the partner, with the remaining 40% retained by Bannerman for international marketing.

“Part of the deal is to sell 60% of our uranium to our partner,” Chamberlain said, adding that the pricing is market-related and that rising uranium prices would lift royalties paid to Namibia.

He said Bannerman’s strategy includes breaking construction packages into smaller work scopes to improve access for local contractors with limited balance sheets, and extending that approach to small and medium enterprises through subcontracting arrangements managed by main contractors.

“A Namibian mine for Namibians,” Chamberlain said, adding that Bannerman has so far achieved a “100% success rate” with its approach to awarding appropriately sized contracts to Namibian firms.

He also said Bannerman’s contracts require compliance with Namibian labour and safety laws throughout the contractor and subcontractor chain.

“My contracts are written such that there’s a contractual onus on the main contractor to comply with all Namibian law,” he said.

Water supply tied to desalination, pipeline under construction

On water, Chamberlain said Bannerman has a signed memorandum of understanding with NamWater for desalination supply from Orano’s plant, and that the project is already constructing a permanent pipeline from Swakopmund to the site.

“We are already constructing the permanent water line from the base supply camp at Swakopmund through to site,” he said.

He said Bannerman had checked claims about available desalination capacity and is satisfied that supply is sufficient to support the project alongside existing mines and municipalities.

Chamberlain said Etango will use heap leaching and claimed the heap leach pad has been designed with protective layers, lined trenches and lined ponds to prevent seepage, with environmental approvals in place. He said the project will operate a progressive heap-leach design with five-metre cells rather than building high-stacked heaps.

He also corrected the mine-life framing used in some public discussions, saying Etango-8 is designed for around 15 years, with optional expansion pathways that change output rates and life-of-mine outcomes depending on uranium prices and development decisions made after production begins.

On project funding, Chamberlain said the remaining amount required to reach FID is about US$315 million, excluding additional working capital that may be needed once the mine is commissioned but before revenues start flowing.

“The financial investment decision is the remainder that we have to still fund is in the region of US$315 million,” he said.

Share220Tweet138
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Okanjande graphite to be upgraded into Battery Anode Material in a N$3b facility in France

Northern Graphite begins relocating plant for Okanjande restart late 2027

May 7, 2026
Otjikoto delivers N$13 billion revenue as 2025 gold output nears 200,000 ounces

Otjikoto’s Q1 2026 revenue rises to N$2.9 billion despite sharp drop in gold output

May 7, 2026
Kameelburg drilling confirms rare earth, strontium and niobium system

Aldoro hits 0.76% niobium over 11m, 2.94% REE at 74m at Kameelburg

May 7, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In