• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, October 17, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Deep Yellow postpones Tumas investment decision beyond 2026

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas finds multiple high-grade copper zones at Deblin near Otavi

    Serval confirms copper mineralisation in Namibia’s Kaoko Basin

    Serval allocates US$7.1m to Namibia copper exploration

    Madison Metals starts drilling at Khan Project in Namibia

    Critical One plans Critical Two Energy for Namibian uranium assets after failed US$3.5m sale

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast commits N$13.75m to uranium exploration near Langer Heinrich

    Higher uranium prices cushion 19% production drop at Langer Heinrich

    Higher uranium prices cushion 19% production drop at Langer Heinrich

    Arkle brings forward second uranium target after encouraging Namibia drilling

    Arkle finds uranium along 2.9km stretch near Trekkopje

    Keras becomes Okopa after securing 51% stake in Cornerstone Mining

    Keras becomes Okopa after securing 51% stake in Cornerstone Mining

    Noronex sees Powerline drill campaign as key toward commercial-scale discovery

    Noronex exits DorWit, its first Namibian copper projects

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Elevate redefines Marenica with 40.2 Mlb at 185 ppm after data overhaul

by Editor
February 5, 2026
in Uranium
0
Elevate Uranium raises N$312m to accelerate Namibian drilling
536
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium Limited has updated the mineral resource estimate for its Marenica Uranium Project in Namibia, defining 40.2 million pounds of U₃O₈ at an average grade of 185 ppm at a 100 ppm cut-off grade, effectively doubling the grade of the previous estimate.

At a 50 ppm cut-off grade, the updated resource increases to 59.0 million pounds of U₃O₈, with the average grade rising 32% to 124 ppm compared with the earlier JORC 2004 resource.

The revised estimate follows a comprehensive re-analysis and validation of more than 5,000 historical drill holes completed across the project area between 1978 and 2011 and has been prepared in accordance with JORC 2012 standards.

The 100 ppm cut-off resource comprises 33.5 million tonnes of mineralisation, including 15.2 million tonnes in the Indicated category and 18.3 million tonnes classified as Inferred, containing a total of 40.2 million pounds of U₃O₈.

Elevate said the decision to raise the cut-off grade from 50 ppm aligns Marenica with the rest of its Namibian uranium portfolio and reflects a more conservative approach to resource definition.

“The new resource of 40.2 Mlb U₃O₈ at a grade of 185 ppm U₃O₈ is essentially double the previous resource grade,” managing director Murray Hill said. “This resource update is a transformative milestone for the Marenica Uranium Project in Namibia.”

Hill said the improvement follows extensive technical work completed during 2025.

“A significant reanalysis and rework of the underlying data from over 5,000 historical drill holes during 2025 enabled estimation of this more robust mineral resource which materially enhances the development potential of the Marenica Project,” he said.

Some mineralised areas included in earlier estimates have been excluded from the updated resource because they do not meet the company’s current drill-density standards, with historical drill spacing in some zones reaching up to 300 metres between lines.

Elevate said this reflects a deliberate and conservative approach.

“The updated MRE excludes some mineralised areas that do not meet the company’s current drill density standards, reflecting a conservative approach designed to maximise confidence and reliability,” Hill said. “We view this as a clear growth opportunity.”

Infill drilling in the excluded southern and south-eastern areas is scheduled to commence later this month and is expected to be completed within two months.

Separate drilling programmes will also target the conversion of parts of the current Inferred resource to the Indicated category.

“Simultaneous drill programs will target upgrading areas of Inferred resource to the Indicated category,” Hill said. “With this significant increase in grade and a robust, re-validated database in place, Marenica now offers a reduced-risk foundation to accelerate our strategy of becoming a leading uranium developer.”

Uranium mineralisation at Marenica is hosted in calcrete within palaeochannels and in weathered basement rocks beneath and adjacent to these channels.

Uranium occurs mainly as carnotite, precipitated from uranium-bearing groundwaters, consistent with other uranium deposits in Namibia’s Central Erongo region.

Approximately 90% of the Marenica mineral resource lies within 35 metres of surface, supporting the potential for shallow, low-strip mining methods using surface miners, subject to future technical and economic studies.

Elevate developed its proprietary U-pgrade™ beneficiation process using Marenica ore, and the higher grades defined in the updated resource are expected to enhance project economics.

Pilot-scale metallurgical test work on bulk samples from the deposit is scheduled for the first quarter of 2026, aimed at refining processing parameters across different lithologies and grade ranges.

The company said the combination of a higher-grade resource, a re-validated drilling database and planned drilling and metallurgical programmes significantly de-risks the Marenica Project and strengthens its position within Elevate Uranium’s Namibian development pipeline.

Share214Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

October 16, 2026
Deep Yellow locks in water, local ownership ahead of Tumas investment decision

Deep Yellow postpones Tumas investment decision beyond 2026

October 16, 2026
Midas kicks off major drill campaign at Otavi Copper Project

Midas finds multiple high-grade copper zones at Deblin near Otavi

October 15, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In