• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, May 10, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Okanjande graphite to be upgraded into Battery Anode Material in a N$3b facility in France

    Northern Graphite begins relocating plant for Okanjande restart late 2027

    Kaoko Metals lists with $6.5m raise, targets high-grade Chalkos Copper-Silver Project

    Kaoko Metals lists with $6.5m raise, targets high-grade Chalkos Copper-Silver Project

    Shaanika takes over as Chamber CEO as Malango retires after 20 years

    Shaanika takes over as Chamber CEO as Malango retires after 20 years

    General Copper targets 80% stake in Otjozondjupa 48,500ha licence

    General Copper targets 80% stake in Otjozondjupa 48,500ha licence

    Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

    Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

    Mining exports hit N$64.7bn as Namibia shifts focus to energy, oil and gas — Nandi-Ndaitwah

    Namibia says 51% free-carry mine ownership not policy

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas hits 50m at 7.9% CuEq in highest-grade Otavi intercept yet

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Elevate redefines Marenica with 40.2 Mlb at 185 ppm after data overhaul

by Editor
February 5, 2026
in Uranium
0
Elevate Uranium raises N$312m to accelerate Namibian drilling
521
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium Limited has updated the mineral resource estimate for its Marenica Uranium Project in Namibia, defining 40.2 million pounds of U₃O₈ at an average grade of 185 ppm at a 100 ppm cut-off grade, effectively doubling the grade of the previous estimate.

At a 50 ppm cut-off grade, the updated resource increases to 59.0 million pounds of U₃O₈, with the average grade rising 32% to 124 ppm compared with the earlier JORC 2004 resource.

The revised estimate follows a comprehensive re-analysis and validation of more than 5,000 historical drill holes completed across the project area between 1978 and 2011 and has been prepared in accordance with JORC 2012 standards.

The 100 ppm cut-off resource comprises 33.5 million tonnes of mineralisation, including 15.2 million tonnes in the Indicated category and 18.3 million tonnes classified as Inferred, containing a total of 40.2 million pounds of U₃O₈.

Elevate said the decision to raise the cut-off grade from 50 ppm aligns Marenica with the rest of its Namibian uranium portfolio and reflects a more conservative approach to resource definition.

“The new resource of 40.2 Mlb U₃O₈ at a grade of 185 ppm U₃O₈ is essentially double the previous resource grade,” managing director Murray Hill said. “This resource update is a transformative milestone for the Marenica Uranium Project in Namibia.”

Hill said the improvement follows extensive technical work completed during 2025.

“A significant reanalysis and rework of the underlying data from over 5,000 historical drill holes during 2025 enabled estimation of this more robust mineral resource which materially enhances the development potential of the Marenica Project,” he said.

Some mineralised areas included in earlier estimates have been excluded from the updated resource because they do not meet the company’s current drill-density standards, with historical drill spacing in some zones reaching up to 300 metres between lines.

Elevate said this reflects a deliberate and conservative approach.

“The updated MRE excludes some mineralised areas that do not meet the company’s current drill density standards, reflecting a conservative approach designed to maximise confidence and reliability,” Hill said. “We view this as a clear growth opportunity.”

Infill drilling in the excluded southern and south-eastern areas is scheduled to commence later this month and is expected to be completed within two months.

Separate drilling programmes will also target the conversion of parts of the current Inferred resource to the Indicated category.

“Simultaneous drill programs will target upgrading areas of Inferred resource to the Indicated category,” Hill said. “With this significant increase in grade and a robust, re-validated database in place, Marenica now offers a reduced-risk foundation to accelerate our strategy of becoming a leading uranium developer.”

Uranium mineralisation at Marenica is hosted in calcrete within palaeochannels and in weathered basement rocks beneath and adjacent to these channels.

Uranium occurs mainly as carnotite, precipitated from uranium-bearing groundwaters, consistent with other uranium deposits in Namibia’s Central Erongo region.

Approximately 90% of the Marenica mineral resource lies within 35 metres of surface, supporting the potential for shallow, low-strip mining methods using surface miners, subject to future technical and economic studies.

Elevate developed its proprietary U-pgrade™ beneficiation process using Marenica ore, and the higher grades defined in the updated resource are expected to enhance project economics.

Pilot-scale metallurgical test work on bulk samples from the deposit is scheduled for the first quarter of 2026, aimed at refining processing parameters across different lithologies and grade ranges.

The company said the combination of a higher-grade resource, a re-validated drilling database and planned drilling and metallurgical programmes significantly de-risks the Marenica Project and strengthens its position within Elevate Uranium’s Namibian development pipeline.

Share208Tweet130
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Okanjande graphite to be upgraded into Battery Anode Material in a N$3b facility in France

Northern Graphite begins relocating plant for Okanjande restart late 2027

May 7, 2026
Otjikoto delivers N$13 billion revenue as 2025 gold output nears 200,000 ounces

Otjikoto’s Q1 2026 revenue rises to N$2.9 billion despite sharp drop in gold output

May 7, 2026
Kameelburg drilling confirms rare earth, strontium and niobium system

Aldoro hits 0.76% niobium over 11m, 2.94% REE at 74m at Kameelburg

May 7, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In